Heat & Glo LifeStyle manual 6000TRI-IPI, 6000TRI-SP, Log set assembly

Page 4

Service Parts

6000TRI-IPI, 6000TRI-SP

 

 

 

(NG, LP) Exploded Parts Diagram

Beginning Manufacturing Date: 4-2001

(GN, PL) Vue éclatée des pièces

 

Ending Manufacturing Date: ________

14 15

1

2

17

18

16

5

4

 

3

 

6 Log set assembly

13

*Part number list on following page.

*La liste des numéros de pièce se trouve à la page suivante.

10

12

7

 

11

 

8

9

4

Heat & Glo • 6000TRI-IPI, 6000TRI-SP385-901 Rev. F • 5/05

Image 4
Contents Installers Guide What to do if you smell gasSafety and Warning Information Table of Contents Log set assembly 6000TRI-IPI, 6000TRI-SPService Parts List / Liste des pièces de rechange 6000TRI-SP, 6000TRI-IPIIntermittent Pilot Ignition Valve Assembly 6000TRI-IPIStanding Pilot Ignition Valve Assembly 6000TRI-SPInstallation Codes High Altitude InstallationsAppliance Certification CertificationIntroducing the Heat & Glo Gas Fireplaces Pre-install PreparationANY Such Action MAY Possibly Cause a Fire Hazard Diagram of the 6000TRI-IPI, 6000TRI-SP Locating the Fireplace Constructing the Fireplace ChaseClearance Requirements Framing Dimensions Framing the FireplaceDVP90ST Installing the Vent System Vent System ApprovalsTems or Components MAY be Used Identifying Vent ComponentsVertical Venting Flue Restrictor InstructionsMAX .4 M Straight Up Vertical Venting Chart Venting with ONE 1 90 Elbow Venting with One 90 ElbowVenting with TWO 2 90 o Elbows Venting with Two 90 ElbowsVenting with Three 3 90 Elbows Venting with three 90 elbows+ V 1 FT + H 1 FT Installing Vent Components Install Support Brackets To Install the Heat ShieldContinue Adding Vent Components 12 Hole and Vent Pipe Vent Termination Attic FirestopVent Termination Minimum Clearances Proper Positioning Positioning, Leveling, Securing the FireplaceLeveling and Securing of a Fireplace Installing the Optional Heat-Zone Kit Vice Must be Wired Directly to the FIRE- Place Junction BOXGas Control Systems Intermittent Pilot Ignition IPI SystemGas Pressure Requirements Gas Supply LinePressure Natural Gas Propane Intermittent Pilot Ignition IPI Wiring Diagram Wiring the Fireplace Finishing Sealant Material Hearth ExtensionsInstalling Trim, Logs, and Ember Material Air Shutter Setting Double-check for faulty componentsBefore Lighting the Fireplace After the Installation Fireplace MaintenanceLighting the Fireplace Important Turn OFF the GAS Before Servicing Your Fireplace