Heat & Glo LifeStyle 6000TRI-IPI, 6000TRI-SP manual Positioning, Leveling, Securing the Fireplace

Page 26

2FT.

MIN.

TERMINATION

CAP

 

HORIZONTAL

 

OVERHANG

20 INCH MIN.

VERTICAL

 

LOWEST

WALL

 

DISCHARGE

 

OPENING

 

X

12

ROOF PITCH

IS X/ 12

H (MIN.) - MINIMUM HEIGHT FROM ROOF TO LOWEST DISCHARGE OPENING

!WARNING: MAJOR U.S. BUILDING CODES SPECIFY MINIMUM CHIMNEY AND/OR

VENT HEIGHT ABOVE THE ROOF TOP. THESE MIN- IMUM HEIGHTS ARE NECESSARY IN THE INTER- EST OF SAFETY. SEE THE FOLLOWING DIAGRAM FOR MINIMUM HEIGHTS, PROVIDED THE TERMI- NATION CAP IS AT LEAST 20 INCHES FROM A VERTICAL WALLAND 2-FEET BELOW A HORIZON- TAL OVERHANG.

NOTE: This also pertains to vertical vent systems in- stalled on the outside of the building.

To seal the roof hole, and to divert rain and snow from the vent system:

Roof Pitch

H (min.) ft.

flat to 6/12

1.0

6/12 to 7/12

1.25

over 7/12 to 8/12

1.5

over 8/12 to 9/12

2.0

over 9/12 to 10/12

2.5

over 10/12 to 11/12

3.25

over 11/12 to 12/12

4.0

over 12/12 to 14/12

5.0

over 14/12 to 16/12

6.0

over 16/12 to 18/12

7.0

over 18/12 to 20/12

7.5

over 20/12 to 21/12

8.0

Figure 30. Minimum Height from Roof to Lowest Discharge Opening

For Vertical Terminations - To locate the vent and install the vent sections:

Locate and mark the vent centerpoint on the underside of the roof, and drive a nail through the centerpoint.

Make the outline of the roof hole around the centerpoint nail.

The size of the roof hole framing dimensions depend on the pitch of the roof. There MUST BE a 1-inch (25.4mm) clear- ance from the vertical vent pipe to combustible materials.

Mark the roof hole accordingly.

Cover the opening of the installed vent pipes.

Cut and frame the roof hole.

Use framing lumber the same size as the roof rafters and install the frame securely. Flashing anchored to the frame must withstand heavy winds.

Continue to install concentric vent sections up through the roof hole (for inside vent installations) or up past the roof line until you reach the appropriate distance above the roof (for outside terminations).

Attach a flashing to the roof using nails, and use a non- hardening mastic around the edges of the flashing base where it meets the roof.

Attach a storm collar over the flashing joint to form a water-tight seal. Place non-hardening mastic around the joint, between the storm collar and the vertical pipe.

Slide the termination cap over the end of the vent pipe and snap into place.

Step 4. Positioning, Leveling, and

Securing the Fireplace

The diagram below shows how to properly position, level, and secure the fireplace.

NAILING TABS

 

(BOTH SIDES)

 

Figure 31.

Proper Positioning,

Leveling and Securing of a Fireplace

Place the fireplace into position.

Level the fireplace from side to side and front to back.

Shim the fireplace with non-combustible material, such as sheet metal, as necessary.

Secure the fireplace to the framing by nailing or screwing.

26

Heat & Glo • 6000TRI-IPI, 6000TRI-SP385-901 Rev. F • 5/05

Image 26
Contents Installers Guide What to do if you smell gasSafety and Warning Information Table of Contents Log set assembly 6000TRI-IPI, 6000TRI-SPService Parts List / Liste des pièces de rechange 6000TRI-SP, 6000TRI-IPIIntermittent Pilot Ignition Valve Assembly 6000TRI-IPIStanding Pilot Ignition Valve Assembly 6000TRI-SPAppliance Certification Installation CodesHigh Altitude Installations CertificationANY Such Action MAY Possibly Cause a Fire Hazard Pre-install PreparationIntroducing the Heat & Glo Gas Fireplaces Diagram of the 6000TRI-IPI, 6000TRI-SP Clearance Requirements Constructing the Fireplace ChaseLocating the Fireplace Framing Dimensions Framing the FireplaceDVP90ST Tems or Components MAY be Used Installing the Vent SystemVent System Approvals Identifying Vent ComponentsMAX .4 M Straight Up Vertical Venting Flue Restrictor InstructionsVertical Venting Chart Venting with ONE 1 90 Elbow Venting with One 90 ElbowVenting with TWO 2 90 o Elbows Venting with Two 90 ElbowsVenting with Three 3 90 Elbows Venting with three 90 elbows+ V 1 FT + H 1 FT Installing Vent Components Continue Adding Vent Components To Install the Heat ShieldInstall Support Brackets 12 Hole and Vent Pipe Vent Termination Attic FirestopVent Termination Minimum Clearances Leveling and Securing of a Fireplace Positioning, Leveling, Securing the FireplaceProper Positioning Gas Control Systems Installing the Optional Heat-Zone KitVice Must be Wired Directly to the FIRE- Place Junction BOX Intermittent Pilot Ignition IPI SystemPressure Natural Gas Propane Gas Supply LineGas Pressure Requirements Intermittent Pilot Ignition IPI Wiring Diagram Wiring the Fireplace Finishing Sealant Material Hearth ExtensionsInstalling Trim, Logs, and Ember Material Before Lighting the Fireplace Double-check for faulty componentsAir Shutter Setting Lighting the Fireplace After the InstallationFireplace Maintenance Important Turn OFF the GAS Before Servicing Your Fireplace