Secondary Installation
OPTIONAL CERAMIC BRICK PANEL INSTALLATION:
Figure 49. Back Panel In Place.
Turn off the gas control knob and allow the unit to cool.
Please ensure that your ceramic panels have not been damaged.
To Install Panels:
1.Remove the glass door by following the
instruction in the “SECONDARY INSTALLATION -
GLASS DOOR REMOVAl” section and remove logs if necessary.
2.Slide center brick panel up behind the baffle (shown in Figure 49) and rest the bottom of the panel on the ledge.
3.Using a flat head screwdriver, bend the top tabs on either side at the front of the baffle down (refer to Figure 51 for placement).
4.Slide the right panel along the side of the firebox until it is tight against the right side of the center panel. Ensure the panel is behind the top tab (see Figure 50).
5.Bend up the right bottom tab until it touches the bottom of the right panel (see Figure 52) and press the top right tab tight against the top of the panel (see
Figure 51).
6.Repeat steps 4 and 5 for the left panel.
7.Install the log set (refer to SECONDARY INSTALLATION - LOG SET
AND EMBER INSTALLATION) and glass door.
To Remove Panels:
1.Pull the bottom and top tabs away from the side panels.
2.Carefully slide the side panels out towards the front, do not slide the panels on the tabs.
3.Push the center panel straight up about 1⁄4 inch (5 mm), pull the bottom out past the ledge, then pull the panel down until it is past the bottom of the baffle. Remove panel from firebox
Figure 50. Right Panel In Place.
|
|
|
Figure 51. Top Tab For Right Panel. |
| Figure 52. Bottom Tab For Right Panel. |
32