PB Heat MIH manual Wiring and Connection Diagram Intermittent Ignition

Page 20

ELECTRICAL

Figure 6.3: Wiring and Connection Diagram – Intermittent Ignition

2. Intermittent Ignition (see Figure 6.3 above)

a.The vent damper is continuously powered. On a call for heat, limit relay R is energized, which energizes:

the circulator (when used) through contact R1, and

the vent damper operator through contact R2, provided that the high-limit aquastat switch is closed.

The damper operator opens the vent damper.

b.Once the damper is proven open, the ignition circuit within the gas valve energizes, provided that all of the following conditions are met:

the blocked vent switch is closed, and

the flame rollout switch is closed.

c.When the call for heat ends:

Limit relay R de-energizes, which opens contacts R1 and R2.

The circulator shuts down.

The gas valve de-energizes.

The vent damper closes.

d.If temperature exceeds limit setting, main burners shut off and circulator continues to operate.

18

Image 20
Contents Series MI/MIH Table of Contents Special Attention Boxes Using this ManualInstallation Sequence Preinstallation Accessibility ClearancesClearance from Combustible Construction AIR for Combustion and VentilationAir Openings All Air from Indoors on Different Floors Air Openings All Air from Outdoors through Vertical Ducts Installation Survey Planning the LayoutBoiler SET-UP Water Piping and Controls Boiler Supply and ReturnSafety Relief Valve Parallel Hook-Up with Water ChillerPiping for Zoned Systems Zone Piping with Zone ValvesFreeze Protection Expansion TankINDIRECT-FIRED Water Heater Integral Draft Hood Vent Damper Installation GeneralVenting Vent Piping and Chimney Venting with Vent Damper in Vertical PositionBoiler Removal from Common Venting System Seal any unused openings in the common venting systemGAS Piping Gas Connection to Boiler MIH Boiler Natural Gas Electrical Wiring ControlsZoned System Wiring Sequence of Operation Wiring and Connection Diagram Intermittent Ignition Intermittent Ignition System Operating Sequence Zone Wiring with Zone Valves START-UP Procedures Completing the InstallationValve Tapping and Adjustment Screw Locations Operating Instructions For Your Safety Read Before Lighting Control Descriptions Adjustment of GAS Pressure RegulatorAdjustment of Pilot GAS Flow CHECK-OUT Procedure Checking Burner InputSTART-UP Procedures Troubleshooting Troubleshooting GuidesProblem Possible Causes Corrective Actions Intermittent Ignition System Troubleshooting Sequence Maintenance General Daily with Boiler in USEWeekly with Boiler in USE Monthly with Boiler in USEAnnually Before Start of Heating Season Standing Pilot and Main Burner FlameBoiler Dimensions & Ratings Series MI/MIH Boiler DimensionsRepair Parts Repair Parts Series MI/MIH GAS Boiler2Manifold Manifold/Gas Train MI Standing Pilot 3b Gas Valve and Pilot Intermittent 4Block/Draft Hood 4a Block/Draft Hood 5Jacket 6Controls/Circulator/Vent Damper Series MI/MIH