PB Heat MIH manual Safety Relief Valve, Parallel Hook-Up with Water Chiller

Page 10

WATER PIPING AND CONTROLS

6.Install this boiler so that the gas ignition system components are protected from water (dripping, spraying, etc.) during appliance operation and service (circulator replacement, condensate trap, control replacements, etc.).

7.If this boiler and distribution system is used in conjunction with a refrigeration system, pipe the chilled medium in parallel with the boiler and install the proper valve to prevent the chilled medium from entering the boiler. A drawing illustrating this hook- up is provided in Figure 3.2.

8.When the boiler is connected to heating coils located in air handling units where they may be exposed to refrigerated air circulation, install flow control valves or other automatic means to prevent gravity circulation of the boiler water during the cooling cycle.

9. If this boiler is installed above radiation level,

Figure 3.2: Parallel Hook-Up with Water Chiller

provide a low water cutoff device, either as a part of

 

the boiler or at the time of boiler installation.

 

B. SAFETY RELIEF VALVE

1. Locate safety relief valve and fittings in bag assembly.

2. If air elimination is not required at the safety relief valve tapping, install valve and piping as shown in Figure 3.3.

3.For air elimination at the safety relief valve tapping, install valve and piping as shown in Figure 3.4.

CAUTION

Pipe the discharge of safety relief valve to prevent injury in the event of pressure relief. Pipe the discharge to a drain. Provide piping that is the same size as the safety relief valve outlet.

Figure 3.3: Safety Relief Valve Hook-Up

Installation with Air Elimination in

System Piping

Figure 3.4: Safety Relief Valve Hook-Up with

Air Elimination

8

Image 10
Contents Series MI/MIH Table of Contents Installation Sequence Using this ManualSpecial Attention Boxes Clearance from Combustible Construction PreinstallationAccessibility Clearances AIR for Combustion and VentilationAir Openings All Air from Indoors on Different Floors Air Openings All Air from Outdoors through Vertical Ducts Installation Survey Planning the LayoutBoiler SET-UP Water Piping and Controls Boiler Supply and ReturnSafety Relief Valve Parallel Hook-Up with Water ChillerPiping for Zoned Systems Zone Piping with Zone ValvesINDIRECT-FIRED Water Heater Expansion TankFreeze Protection Venting Vent Damper Installation GeneralIntegral Draft Hood Vent Piping and Chimney Venting with Vent Damper in Vertical PositionBoiler Removal from Common Venting System Seal any unused openings in the common venting systemGAS Piping Gas Connection to BoilerMIH Boiler Natural Gas Zoned System Wiring Wiring ControlsElectrical Sequence of Operation Wiring and Connection Diagram Intermittent Ignition Intermittent Ignition System Operating Sequence Zone Wiring with Zone Valves START-UP Procedures Completing the InstallationValve Tapping and Adjustment Screw Locations Operating Instructions For Your Safety Read Before Lighting Adjustment of Pilot GAS Flow Adjustment of GAS Pressure RegulatorControl Descriptions CHECK-OUT Procedure Checking Burner InputSTART-UP Procedures Troubleshooting Troubleshooting GuidesProblem Possible Causes Corrective Actions Intermittent Ignition System Troubleshooting Sequence Maintenance Weekly with Boiler in USE GeneralDaily with Boiler in USE Monthly with Boiler in USEAnnually Before Start of Heating Season Standing Pilot and Main Burner FlameBoiler Dimensions & Ratings Series MI/MIH Boiler DimensionsRepair Parts Repair Parts Series MI/MIH GAS Boiler2Manifold Manifold/Gas Train MI Standing Pilot 3b Gas Valve and Pilot Intermittent 4Block/Draft Hood 4a Block/Draft Hood 5Jacket 6Controls/Circulator/Vent Damper Series MI/MIH