BOILER
2.BOILER SET-UP
1.Provide a sound, level foundation. Locate boiler as near to the chimney or outside wall as possible and centralized with respect to the heating system.
2.Locate boiler in front of installation position before removing crate.
3.If using combustible floor pan, position pan on foundation or flooring.
4.Separate the wood shipping pallet from the boiler base by removing two (2)
5.Move boiler into final position. If using combustible floor pan, install boiler on pan as outlined in the instructions included with the pan.
6