PB Heat MIH manual Water Piping and Controls, Boiler Supply and Return

Page 9

WATER PIPING AND CONTROLS

3. WATER PIPING AND CONTROLS

A.BOILER SUPPLY AND RETURN

1.Size the supply and return to suit the system. A typical piping arrangement is shown in Figure 3.1. Refer also to the I=B=R Guide - Residential Hydronic Heating Installation/Design and the PB Heat Water Survey for additional guidance during water piping installation.

2.Return Piping:

Pipe the drain valve to a tee, provided, and the

1-1/4 NPT return tapping near the bottom of the left section. Pipe the return to the tee. Pipe the drain valve nipples and tee to the 1-1/4 NPT return tapping as shown in Figure 3.1.

3.Supply Piping:

Pipe the supply to the 1-1/2 NPT supply tapping at the top and rear of the boiler.

4.When system return water temperature will be below 130°F (54°C), pipe the boiler with a bypass arrangement to blend the system return and hot supply to obtain at least 130°F (54°C) entering the boiler. For more information on bypass piping, consult the PB Heat Water Survey.

Figure 3.1: Supply and Return Piping

7

Image 9
Contents Series MI/MIH Table of Contents Using this Manual Installation SequenceSpecial Attention Boxes Accessibility Clearances PreinstallationClearance from Combustible Construction AIR for Combustion and VentilationAir Openings All Air from Indoors on Different Floors Air Openings All Air from Outdoors through Vertical Ducts Planning the Layout Installation SurveyBoiler SET-UP Boiler Supply and Return Water Piping and ControlsParallel Hook-Up with Water Chiller Safety Relief ValveZone Piping with Zone Valves Piping for Zoned SystemsExpansion Tank INDIRECT-FIRED Water HeaterFreeze Protection Vent Damper Installation General VentingIntegral Draft Hood Venting with Vent Damper in Vertical Position Vent Piping and ChimneySeal any unused openings in the common venting system Boiler Removal from Common Venting SystemGas Connection to Boiler GAS PipingMIH Boiler Natural Gas Wiring Controls Zoned System WiringElectrical Sequence of Operation Wiring and Connection Diagram Intermittent Ignition Intermittent Ignition System Operating Sequence Zone Wiring with Zone Valves Completing the Installation START-UP ProceduresValve Tapping and Adjustment Screw Locations Operating Instructions For Your Safety Read Before Lighting Adjustment of GAS Pressure Regulator Adjustment of Pilot GAS FlowControl Descriptions Checking Burner Input CHECK-OUT ProcedureSTART-UP Procedures Troubleshooting Guides TroubleshootingProblem Possible Causes Corrective Actions Intermittent Ignition System Troubleshooting Sequence Maintenance Daily with Boiler in USE GeneralWeekly with Boiler in USE Monthly with Boiler in USEStanding Pilot and Main Burner Flame Annually Before Start of Heating SeasonSeries MI/MIH Boiler Dimensions Boiler Dimensions & RatingsRepair Parts Series MI/MIH GAS Boiler Repair Parts2Manifold Manifold/Gas Train MI Standing Pilot 3b Gas Valve and Pilot Intermittent 4Block/Draft Hood 4a Block/Draft Hood 5Jacket 6Controls/Circulator/Vent Damper Series MI/MIH