ELECTRICAL

Figure 6.2: Wiring and Connection Diagram – Standing Pilot (Continuous Ignition)

D.SEQUENCE OF OPERATION

1.Standing Pilot (See Figure 6.2 above)

a.The vent damper is continuously powered. On a call for heat, limit relay R is energized, which energizes:

the circulator (when used) through contact R1, and

the vent damper operator through contact R2, provided that the high-limit switch is closed.

The vent damper operator opens the damper.

b.Once the damper is proven open, the gas valve energizes, provided that all of the following conditions are met:

the pilot thermocouple is proving flame

the blocked vent switch is closed, and

the flame rollout switch is closed.

Pilot flame is monitored through the pilot thermocouple. If pilot flame is lost during a call for heat, main and pilot gas flow will be shut off. The valve must then be manually reset by following the Lighting Instructions mounted on the jacket panel and included in Section 7 of this manual.

c.When the call for heat ends:

Limit relay R de-energizes, which opens contacts R1 and R2.

The circulator shuts down.

The gas valve de-energizes.

The vent damper closes.

d.If temperature exceeds limit setting, main burners shut off and circulator continues to operate.

17

Image 19
Contents Series MI/MIH Table of Contents Installation Sequence Using this ManualSpecial Attention Boxes AIR for Combustion and Ventilation PreinstallationAccessibility Clearances Clearance from Combustible ConstructionAir Openings All Air from Indoors on Different Floors Air Openings All Air from Outdoors through Vertical Ducts Planning the Layout Installation SurveyBoiler SET-UP Boiler Supply and Return Water Piping and ControlsParallel Hook-Up with Water Chiller Safety Relief ValveZone Piping with Zone Valves Piping for Zoned SystemsINDIRECT-FIRED Water Heater Expansion TankFreeze Protection Venting Vent Damper Installation GeneralIntegral Draft Hood Venting with Vent Damper in Vertical Position Vent Piping and ChimneySeal any unused openings in the common venting system Boiler Removal from Common Venting SystemGas Connection to Boiler GAS PipingMIH Boiler Natural Gas Zoned System Wiring Wiring ControlsElectrical Sequence of Operation Wiring and Connection Diagram Intermittent Ignition Intermittent Ignition System Operating Sequence Zone Wiring with Zone Valves Completing the Installation START-UP ProceduresValve Tapping and Adjustment Screw Locations Operating Instructions For Your Safety Read Before Lighting Adjustment of Pilot GAS Flow Adjustment of GAS Pressure RegulatorControl Descriptions Checking Burner Input CHECK-OUT ProcedureSTART-UP Procedures Troubleshooting Guides TroubleshootingProblem Possible Causes Corrective Actions Intermittent Ignition System Troubleshooting Sequence Maintenance Monthly with Boiler in USE GeneralDaily with Boiler in USE Weekly with Boiler in USEStanding Pilot and Main Burner Flame Annually Before Start of Heating SeasonSeries MI/MIH Boiler Dimensions Boiler Dimensions & RatingsRepair Parts Series MI/MIH GAS Boiler Repair Parts2Manifold Manifold/Gas Train MI Standing Pilot 3b Gas Valve and Pilot Intermittent 4Block/Draft Hood 4a Block/Draft Hood 5Jacket 6Controls/Circulator/Vent Damper Series MI/MIH