Sherwood EG40 DV owner manual Vent Termination Restrictions

Page 15

Initial Installation

QUALIFIED INSTALLERS ONLY

VENT TERMINATION RESTRICTIONS:

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

N

 

 

 

 

 

 

 

 

 

O

D

E

 

 

 

 

 

H

 

 

B

 

 

 

 

 

 

 

 

C

 

 

 

 

 

 

 

L

B

Fixed

 

 

B

 

 

 

G

F

Closed

Openable

Fixed

 

 

G

 

 

Openable

Closed

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

M

 

 

B

 

A

 

J

 

 

K

 

 

 

 

 

 

 

 

 

 

 

 

I

A

 

Termination Cap

 

Air Supply Inlet

 

 

 

 

G

Gas Meter

Restriction Zone

 

 

 

 

 

 

 

 

 

(Termination not allowed)

 

Figure 18. Vent Termination Restrictions, refer to Table 2.

Table 2: Vent termination clearances, refer to Figure 18.

Letter

Canadian Installation 1

US Installation2

Description

A

12 in (30 cm)

Clearance above grade, verandah, porch, deck, or balcony.

 

 

 

 

B

12 in (30 cm)

9 in (23 cm)

Clearance from window or door that may be opened.

 

 

 

 

C

12 in (30 cm)*

Clearance from permanently closed window (to prevent

 

 

 

condensation).

 

 

 

D

24 in (60 cm)*

Vertical clearance to ventilated soffit located above the

 

 

 

terminal, within a horizontal distance of 2 ft (60 cm) from

 

 

 

center line of terminal.

 

 

 

E

18 in (45 cm)*

Clearance to unventilated soffit.

 

 

 

F

12 in (30 cm)*

Clearance to outside corner.

 

 

 

G

12 in (30 cm)*

Clearance to inside corner.

 

 

 

 

H

3 ft (91 cm) within a height of

3 ft (91 cm) within a height of

Clearance to each side of center line extended above

 

15 ft (4.5 m) above the meter/

15 ft (4.5 m) above the meter/

meter/regulator assembly.

 

regulator assembly

regulator assembly*

 

 

 

 

 

I

3 ft (91 cm)

3 ft (91 cm)*

Radial clearance around service regulator vent outlet.

 

 

 

 

J

12 in (30 cm)

9 in (23 cm)

Clearance to non-mechanical air supply inlet to building, or

 

 

 

the combustion air inlet to any other appliance.

 

 

 

 

K

6 ft (1.83 m)

3 ft (91 cm) above if within 10

Clearance to mechanical air supply inlet.

 

 

ft (3 m) horizontally

 

 

 

 

 

L

7 ft (2.13 m)t

7 ft (2.13 m)*t

Clearance above paved sidewalk or paved driveway located

 

 

 

on public property.

 

 

 

 

M

12 in / 30 cm+

12 in / 30 cm*+

Clearance under verandah, porch, deck, or balcony.

N

12 in (30 cm)*

Clearance horizontally to any surface (such as an exterior

 

 

 

wall) for vertical terminations.

 

 

 

O

12 in (30 cm)

Clearance above roof line for vertical terminations.

 

 

 

 

1In accordance with the current CSA B149, Natural Gas and Propane Installation Code.

2 In accordance with the current ANSI Z223.1 NFPA 54, National Fuel Gas Code.

* These numbers are only estimates. Clearance in accordance with installation codes and the requirements of the gas supplier.

t A vent shall not terminate directly above a side walk or paved driveway that is located between two single family dwellings and it serves both dwellings. + Permitted only if verandah, porch, deck, or balcony is fully open on a minimum of two sides beneath the floor.

NOTE: Venting terminals shall not be recessed into walls or siding.

15

Image 15
Contents EG40 DV General Safety PrecautionsTable of Contents Vented GAS Fireplace Heater EG40 DV NG/LPG Codes And ApprovalsEG40 Exterior Dimensions SpecificationsOperating Instructions For Your Safety Read Completely Before OperatingComponent Sound & Reason There is a separate venturies for each burner, see FigureRemoving the Door Maintenance and ServiceBurner is lined up Conversion Kit Installation Kit Parts ListRemoving valve Screw Must be not visibleQualified Installers only Initial InstallationCommon Vertical Installation Do not interfere with the structural integrity of the walls Vent Termination Restrictions KIT Components Assembly of Venting Kit Manufacturer Trade Name Nominal Sizes SV4EBR45 Vent restrictor ring End of the pipes and fittings, are Installing Vent Cap with Vinyl Siding Stand-Off Assemble the desired lengths of black pipe Use of Wall Straps Insulation Multi-Story Vent Pipe Installation33a-2002 Test Methods and the Resulting ITS/WH Must be bolted securely to the floor Must be connected to a grounding rodMin. Manifold Pressure Natural Gas Propane Front BurnerRear Burner Manifold PressureLog Placement Secondary InstallationRemove door to clean glass Problem Possible Cause Solution Trouble ShootingT. Nova Valve Convertible 50-1421 Parts ListParts List Parts Diagram Chassis Parts Diagram Gas Tray & Door To the Dealer WarrantyWarranty Warranty Installation Data Sheet