Sherwood EG40 DV owner manual Insulation, Multi-Story Vent Pipe Installation

Page 25

Initial Installation

QUALIFIED INSTALLERS ONLY

For multi story installations. A ceiling firestop is required at the second floor, and any subsequent floors (see Figure 33). The opening should be framed to 10” (25.4 cm) x 10” (25.4 cm) inside dimensions, in the same manner as shown in Figure 29.

Any occupied areas above the first floor, including closets and storage spaces, which the vertical vent passes through, must be enclosed. The enclosure may be framed and sheetrocked with standard building materials. However consult the appliance manufactures installation instructions for the minimum allowable clearance between the outside of the vent pipe, and the combustible surfaces of the enclosure. Do not fill any required air spaces with

insulation.

Figure 33: Multi-Story Vent Pipe Installation.

 

CATHEDRAL CEILING INSTALLATION:

1.Follow installation steps 1 & 2 from INITIAL INSTALLATION - VERTICAL INSTALLATION.

2.Using the plumb bob, mark the center line of the venting system on the ceiling and drill a small hole

through the ceiling and roof at this point. From the roof, locate the drill hole and mark the outline of the Cathedral Ceiling Support Box.

3.Remove shingles or other roof coverings as necessary to cut the rectangular hole for the Support Box. Cut the hole 1⁄8” larger than the Support Box outline.

4.Lower the Support Box through the hole in the roof until the bottom of the Support Box protrudes at least 2 inches (5 cm) below the ceiling. Align the Support Box both vertically and horizontally with a level as shown in Figure 34. Temporarily tack the Support Box in the place through the inside walls and into the roof sheathing.

Figure 34: Cathedral Ceiling Support Box

Leveling.

5.Using tin snips, cut the Support Box from the top corners down to the roof line, and fold the resulting flaps over the roof sheathing (Figure 35). Before nailing it in to the roof, run a bead of non-hardening mastic around the top edges of the Support Box to make a seal between the box and the roof. Clean out any combustible material from

 

the inside

of

the

 

 

Support Box.

 

 

6. Complete

 

the

 

cathedral

ceiling

 

installation

 

by

 

following

 

the

 

same

procedures

 

outlined

in

Steps

 

4 through

9

from

 

INITIAL INSTALLATION -

 

VERTICAL INSTALLATION.

Figure 35: Cathedral Ceiling Support

 

 

 

 

Box Installation.

 

 

 

 

25

Image 25
Contents EG40 DV General Safety PrecautionsTable of Contents Vented GAS Fireplace Heater EG40 DV NG/LPG Codes And ApprovalsEG40 Exterior Dimensions SpecificationsOperating Instructions For Your Safety Read Completely Before OperatingComponent Sound & Reason There is a separate venturies for each burner, see FigureRemoving the Door Maintenance and ServiceBurner is lined up Conversion Kit Installation Kit Parts ListRemoving valve Screw Must be not visibleQualified Installers only Initial InstallationCommon Vertical Installation Do not interfere with the structural integrity of the walls Vent Termination Restrictions KIT Components Assembly of Venting Kit Manufacturer Trade Name Nominal Sizes SV4EBR45 Vent restrictor ring End of the pipes and fittings, are Installing Vent Cap with Vinyl Siding Stand-Off Assemble the desired lengths of black pipe Use of Wall Straps Insulation Multi-Story Vent Pipe Installation33a-2002 Test Methods and the Resulting ITS/WH Must be bolted securely to the floor Must be connected to a grounding rodRear Burner Natural Gas Propane Front BurnerManifold Pressure Min. Manifold PressureLog Placement Secondary InstallationRemove door to clean glass Problem Possible Cause Solution Trouble ShootingT. Nova Valve Convertible 50-1421 Parts ListParts List Parts Diagram Chassis Parts Diagram Gas Tray & Door To the Dealer WarrantyWarranty Warranty Installation Data Sheet