INSTALLATION INSTRUCTIONS

6.Pump

6.1Where a pump is fitted into the circuit it should be adjustable so that the flow can match the system requirements. Fit isolation valves to enable removal for servicing. The pump must have at least 1.5 meters of static head.

7.Electrical Supply

7.1Electrical connections must meet the requirements of national Building Regulations* and standards**, along with any European, local regulations and working practices that may apply. Should conflict occur between these instructions and these regulations then the regulations must be followed.

The connection to the mains supply should allow complete electrical isolation and only serve the heating circuit pump.

All water connections should be completed by a competent person to meet the requirements of local water authority by-laws.

CONVENTIONAL Pipe work systems

All pipe work must be able to operate at above 100 degrees Celsius. Any pipe work installed in an exposed position e.g. loft space must have provision to prevent freezing.

Ensure the pipe work system has sufficient drain points to enable the complete removal of water for the purposes of servicing.

8.Gravity Pipe Circuit

8.1To prevent the risk of boiling it is essential to arrange the pipe work and position the hot water cylinder and heat leak radiator so that gravity circulation can take place when the pump is not running. Position the cylinder and the radiator vertically above the boiler with sufficient height to encourage gravity flow.

8.2Horizontal pipe work in a gravity system must have an incline of at least 5mm in every 1000mm and a minimum diameter of 28mm. Vertical pipe must have a minimum diameter of 22mm.

8.3Any motorised valves fitted in this circuit must return to the fully open position when the power is interrupted.

9.Pump Assisted Central Heating

9.1The most common arrangement is to have a pumped central heating circuit combined with a gravity hot water circuit. This arrangement requires careful balancing of the two in order to avoid the gravity circuit being starved when the pump is running.

To overcome this problem it is common practice to fit an injector tee where the pumped central heating return re-joins the gravity return from the hot water cylinder. This injector tee induces a much stronger gravity flow when the pump runs.

Only use proprietary injector tees, homemade ones are difficult to get right.

9.2When installing a system that has pumped central heating and gravity hot water it is recommended to use all 4 boiler tappings. Each flow and return should be diagonally opposite each other.

10.Fully Pumped System

10.1In many installations (especially new build) a fully pumped system is the best choice to give increased control.

WARNING - To prevent the risk of boiling it is essential to arrange the pipe work and position the hot water cylinder and heat leak radiator so that gravity circulation can take place when the pump is not running. Any motorised valves fitted in this circuit must return to the fully open position when the power is interrupted.

11.Sealed (Pressurised) System

11.1Do not fit this appliance to sealed or pressurised systems or an unvented hot water cylinder.

12.Pipe work Diagrams

12.1See over for a typical layout of a pumped central heating and gravity hot water circuit.

28

Image 28
Contents Yeoman CL YM-CL8HBContents Appliance Commissioning Checklist Installation EngineerRetailer appliance was purchased from Essential Information Must be completedUser Instructions General PointsSerial Number ThermostatDo not place tool on hot surfaces e.g. top of stove Heating System controlsUse a protected gloved hand to operate Using the Appliance for the First Time CondensationNormal Running Seasonal USELighting the Appliance Solid fuelBurning wood Running The applianceDo not load above the log guard or base of baffle Thermostat Operation RefuellingBurning tips ASH Removal Wood burning tray Extended burningOVER-FIRING Over-firing can cause permanent damage to the applianceGeneral Cleaning Cleaning GlassChimney fire Chimney SweepingTroubleshooting tips Care of stove Seasonal useAll or some of the radiators do not get hot Open up the airwash to makeTECHNICAL SPECIFICATION Standard FeaturesBoiler Output Chart YeomanYeoman Dimensions All dimensions are in mm 25.4mm =Cast Top Plate Incl. feet @ 6mm on underside 563 572 363 105 478 153/6 449 441 225 430 224 317Site Requirements Flue or ChimneyMax. Draught = 2.0mm Wg Min. Draught = 1.0mm Wg U.K Flue PlateHearth Dimensions Flue Outlet PositionsRequirement for the walls Walls Next to a Hearth80mm PRE-INSTALLATION Checks FlueWithout Liner System 150 Flue / Chimney SizeVentilation ModelMm² 4400 Additional Ventilation Changes to Document J, England & Wales, from 01/10/2010Installation Instructions Installing the ApplianceTop flue pipe installation Legal requirementsSecure with self tapping screw Seal the connecting joints Rear flue pipe installationDo not use a 90˚elbow to make this connection To chimney connection as detailed in building regulationsFitting and Removal of the Baffle Removal of Riddling MechanismEnsure baffle sits On front supports Baffle In Place Do not modify the baffleRemove Rear Bar see Diagram Lift bars to removeUnscrew the boss Replace in reverse orderHearth Fixing Cast TOPFixing holes Hearth mounts Top Flue Rear FlueCentral Heating System Pipe work Diagrams PumpElectrical Supply Conventional Pipe work systemsFeed Expansion Cistern Link UP Systems Controls GeneralCommissioning CommissioningInstructions for Use Give the copy of the Instructions to the customerAnnual Service Removal of the LOG Guard Fitting and Removal of BaffleFitting a NEW Door Glass Do not use appliance without the log guard in positionDo not over tighten the clamp as this could break the glass Fitting a new door sealMid door Rope seal E Joint To adjust the door hinge plate assembly Adjusting Door Catch & HingesHetas Approved Chimney Sweeps Spare Parts List Cast Door Service Records