Market Forge Industries M36G100A-4SP, M36G300A-4SP, M24G100A-4SP manual Electrical Information

Page 22

ELECTRICAL INFORMATION

Schematic Diagram for New Generation Boilers - 100K, 200K and 300K BTU

D 98 - 1129

F

19

Image 22
Contents GAS Operated Boiler Table of Contents To the Kitchen Manager Introduction HOW to USE this ManualIntroduction Theory of Operation for GAS BoilerGAS Operated Boilers Models Installation InstructionsInstalling Legs LevelingGAS Service Connections Electric Service ConnectionService Connections Gas Operated BoilersLower Deflector Assembly Operating Instructions First Check to be Sure ThatIf GAS Pressure is LOW AdjustmentsIf GAS Pressure is TOO High Setting the Boiler Control Pressure Switches Pressure Control Switch AdjustmentGeneral TROUBL-SHOOTING Trouble Possible Cause RemedyGeneral TROUBL-SHOOTING Testing Procedure Water Control Board Testing ProcedureIllustrated Parts List Item no Part DescriptionPressure Switch Box Control Box Assembly, with and without Cover Plumbing, Left Side Gas Boiler Front View Gas Boiler, 24, 200K Gas Train, 200K BTU Boiler Shown Gas Train, 200K Boiler Shown Electrical Information Electrical Information Cleaning the Boiler MaintenanceCleaning Instructions Maintenance Application Instructions General NotesDo not Reuse Container