INSTALLATION INSTRUCTIONS

NOTE:

PVC & CPVC PIPE ARE NOT ACCEPTABLE

MATERIALS FOR DRAINS.

WARNING:

DO NOT UNDER ANY CIRCUMSTANCE CONNECT THE EXHAUST DRAIN LINE DIRECTLY TO A SEWER LINE.

 

SERVICE CONNECTIONS:

Gas Operated Boilers

G

GasConnection - 3/4” (19mm) IPS (100 & 200K

 

BTU)

G1

Gas Connection - 1” (25mm) IPS (275 & 300K

 

BTU)

CW1

Cold Water - 3/8” (10mm) O.D. tubing for cold

 

water to boiler. Cold water lines will have a max

 

of 50PSI (3.5 kg/cm2) and a min of 25PSI (1.8

 

kgcm2) water pressure. CAUTION: FILTER SYS-

 

TEM INSTALLATION INSTRUCTIONS MUST BE

 

ADHERED TO WHEN CONNECTING A FILTER

 

TO THIS LINE.

CW2

Cold Water - 3/8” (10mm) O.D. tubing for cold wa-

 

ter to condenser. Cold water lines will have a max

 

of 50PSI (3.5 kg/cm2) and a min of 25PSI (1.8

 

kg/cm2) water pressure.

D

Drain - Pipe full 2” (51mm) IPS to flush floor drain

 

capable of receiving water flowing at a max rate

 

of 5 gal. (19 liters) per minute. DO NOT MAKE

 

SOLID CONNECTION TO FLOOR DRAIN.

EC

Electrical Connection - 120 volt A.C. 60Hz, 1/2”

 

(13mm) conduit connection or equivalent. Use

 

wire suitable for a least 90oC. Amp for 115 steam

 

generator controls is 2 amps.

ST

Steam Take-off - Connection for operation of ad-

 

jacent steam powered equipment.

NOTES: If equipment is installed where elevation exceeds 2,000 feet (609.6 meters) above sea level, specify installa- tion altitude so that proper gas orifices can be provided.

The only available space to supply utilities to the gas boiler is the 6” (152mm) space between the floor and the cabinet. Allow 3” (76mm) space from side wall and 6” (152mm) from real wall if adjoining walls are combustible.

CAUTION: Before connecting water to this unit, water sup- ply should be analyzed to make sure hardness is no greater than 2.0 grains and pH level is within the range of 7.0-8.5. Water which fails to meet these standards should be treated by installation of water conditioner. EQUIPMENT FAILURE CAUSED BY INADEQUATE WATER QUALITY IS NOT COVERED UNDER WARRANTY.

WASTE LINE INSTALLATION: The drain port of the unit is marked with a colored tag and is located at the lower rear left side of the boiler as viewed from the front. This exhaust line may be left open if the boiler has to be situated in a tiled floor depression or a tiled curb section that is equipped with drain facilities. If this is not the case, then a 2” (51mm) NPT. drain line must be connected to divert the exhaust to the floor drain. If it is necessary to use more than three elbows, increase the size of the waste line accordingly.

3

Image 6
Contents GAS Operated Boiler Table of Contents To the Kitchen Manager Introduction HOW to USE this ManualIntroduction Theory of Operation for GAS BoilerGAS Operated Boilers Models Installation InstructionsInstalling Legs LevelingGAS Service Connections Electric Service ConnectionService Connections Gas Operated BoilersLower Deflector Assembly Operating Instructions First Check to be Sure ThatAdjustments If GAS Pressure is LOWIf GAS Pressure is TOO High Setting the Boiler Control Pressure Switches Pressure Control Switch AdjustmentGeneral TROUBL-SHOOTING Trouble Possible Cause RemedyGeneral TROUBL-SHOOTING Testing Procedure Water Control Board Testing ProcedureIllustrated Parts List Item no Part DescriptionPressure Switch Box Control Box Assembly, with and without Cover Plumbing, Left Side Gas Boiler Front View Gas Boiler, 24, 200K Gas Train, 200K BTU Boiler Shown Gas Train, 200K Boiler Shown Electrical Information Electrical Information Maintenance Cleaning the BoilerCleaning Instructions Maintenance Application Instructions General NotesDo not Reuse Container