APPLICATION INSTRUCTIONS
APPLICATION INSTRUCTIONS FOR TOTAL CONCEPT CLEANING OF BOILER
SIZE: 1 Gallon PART NUMBER: 20 - 0307
Fig. 5 | Fig. 8 |
4.Remove the shipping cap, replace it with the pouring cap. Cut the tip of the pouring cap at the first notch to a 45o angle.
5.Install the tubing firmly over the tip of the pouring cap.
Fig. 6
6.Energize compartment to release steam pressure in boiler to “0” PSI before removing pipe plug.
7.Remove the plug from the access port on the steam header pipe inside cabinet doors.
CAUTION: HE7DER PIPE & ACCESS PLUG ARE HOT.
Fig. 7
8.Feed the tubing through the access port in the boiler compartment.
NOTE: A minimum of 12” must be inserted.
Fig. 9
9.Tilt the container, pour the contents into the unit.
10.When empty, refill the container with hot tap water and add to boiler for cleaning. Repeat twice. This additional 2 gallons of water will cause the low water probe to be immersed in cleaner/descaler solution. Replace access plug.
11.After rinsing the container, place tubing inside the bottle, cover with shipping cap, dispose of properly.
DO NOT REUSE CONTAINER.
12.DO NOT ENERGIZE HEATERS. Allow 2 hours for cleaning.
13.After time has elapsed, drain the boiler.
14.Refill the boiler and drain. Repeat this step twice.
15.Bring the boiler to temperature and cycle steam to the cooker compartment to purge cleaner/descaler from the steam supply lines. Repeat this step twice.
16.Boiler is now ready for use.
23