Market Forge Industries M36G200A-4SP manual GAS Service Connections, Electric Service Connection

Page 5

INSTALLATION INSTRUCTIONS

*GAS SERVICE CONNECTIONS:

a)The boiler is factory adjusted for a gas input of 100, 200 & 300K BTU/HR at the pressure indicated. Please read the rating plate behind the Lift-Off Front Panel. If this plate is marked for a different gas than that supplied, notify your dealer immediately. Install an external gas supply shut off valve in a visible and accessible location. If the unit is placed at the minimum side clearances rather than the optimum side clearances, the only acceptable location for the gas supply shut off valve is under the unit in the space provided by the legs.

b)Use new iron or steel pipe complying with the latest ANSI Standard for Wrought-Steel and Wrought-Iron Pipe, B36, properly threaded, reamed and free from chips, oil and dirt. If pipe dope is used, apply a mod- erate amount leaving two end threads bare. Pipe dope must be resistant to LP gas. Connect the gas line into the bottom (inlet) side of the shutoff valve. The supply pressure must be at least 1” (25mm) water column higher than the manifold or regulator pressure for proper functioning of the regulator. If it is not check the supply pipe for blockage or excessive pressure drop and make necessary corrections.

c)Perform a gas leak test of all newly-made joints, as well as those leading to the main gas control valve. Use a soap solution, DO NOT USE FLAME.

d)Natural gas units are equipped with a pressure regulator factory adjusted to give 4” (102mm) water col- umn manifold pressure.

e)Propane gas units are equipped with a pressure regulator, factory adjusted, to give 10” (254mm) water column manifold pressure.

f)ONLY A LICENSED GAS FITTER SHOULD MAKE GAS LINE CONNECTIONS.

*ELECTRIC SERVICE CONNECTION:

Connect boiler controls to 110/120 volt AC, 60Hz, single phase branch circuit rated 15 amps capacity, using the three prong plug provided.

* Gas and Electrical connections should be made by licensed tradesmen only.

2

Image 5
Contents GAS Operated Boiler Table of Contents Introduction Introduction HOW to USE this ManualTo the Kitchen Manager Theory of Operation for GAS BoilerInstalling Legs Installation InstructionsGAS Operated Boilers Models LevelingElectric Service Connection GAS Service ConnectionsGas Operated Boilers Service ConnectionsLower Deflector Assembly First Check to be Sure That Operating InstructionsIf GAS Pressure is TOO High AdjustmentsIf GAS Pressure is LOW Pressure Control Switch Adjustment Setting the Boiler Control Pressure SwitchesTrouble Possible Cause Remedy General TROUBL-SHOOTINGGeneral TROUBL-SHOOTING Water Control Board Testing Procedure Testing ProcedureItem no Part Description Illustrated Parts ListPressure Switch Box Control Box Assembly, with and without Cover Plumbing, Left Side Gas Boiler Front View Gas Boiler, 24, 200K Gas Train, 200K BTU Boiler Shown Gas Train, 200K Boiler Shown Electrical Information Electrical Information Cleaning Instructions MaintenanceCleaning the Boiler Maintenance General Notes Application InstructionsDo not Reuse Container