Bradford-White Corp BRHHV, BRHHH warranty 4B.3 Water Flow Requirements Water Heater

Page 16

Page 16

ΒΡΑΔΦΟΡΔ ΩΗΙΤΕ ΧΟΡΠ.

Figure 4. Hydronic Piping - Multiple Boilers.

4B.3 Water Flow Requirements — Water Heater

In a water heating application (an open system), new water is constantly being introduced. With the new water comes a fresh supply of minerals that can be deposited on the unit’s heat exchanger. This is commonly known as scaling. The amount of minerals will depend upon the hardness of the water. Water can also be aggressive, and can erode metals, including copper, if the water is moved too quickly. Pump sizing for the Brute Magnum water heater is based upon the hardness of the water. The water flow is kept high enough to prevent scaling, but low enough to prevent

tube erosion. For extremely soft or hard water, cupro- nickel tubes are available. Contact a Bradford White Representative if you have questions or concerns about water quality.

The Brute Magnum water heater has an internal mixing system that ensures that the condensation does not occur on the finned copper heat exchanger, with heater return temperature down to 50°F (10°C). This

system, that consists of automatically actuated and linked valves, is set up at the factory, and is non-adjustable. The return water goes through the stainless steel heat exchanger, then to the mixing system. (see Figure 7).

Image 16
Contents Βρυτε Μαγνυμ Βραδφορδ Ωηιτε Χορπ Table of Contents MaintenanceTroubleshooting Replacement PartsList of Tables List of FiguresGeneral Information IntroductionModel Identification Model DesignationDimensions WarrantyLocating the Appliance Inches 91cm horizontally Venting and Combustion AIR Combustion AirCombustion Air From Room Intake Combustion AirLocating Vent & Combustion Air Terminals VentingHorizontal Vent Terminal Combustion Air and Vent Through Side Wall Installation of Carbon Monoxide Detectors From Massachusetts Rules and Regulations 248 CMRCommon Vent Test Boilers Side Wall Combustion Air TerminalVertical Vent Terminal Vertical Combustion Air TerminalGAS Supply and Piping Distance from Gas Meter or Last Stage Regulator4A.1 Heating System Piping Hot Supply Connections Boiler Water Connections Brute Magnum Boiler4A.2 Cold Water Make-Up Boiler Water Connections Brute Magnum Water Heater 4A.3 Freeze Protection Boiler4B.1 Water System Piping Water Heater 4B.2 Hot Water Supply Piping Water Heater4B.3 Water Flow Requirements Water Heater Hydronic Piping Multiple BoilersHydronic Piping Multiple Boilers Alternate Hydronic Piping One Boiler, Multi-Temperature System 4B.4 Combined Water potable Heating and Space HeatingHeater or in the pipes in the system. When water 4B.5 Freeze Protection Water HeaterWater Heater Piping One Heater, One Tank Water Heater Piping Multiple Heaters, One Tank Water Heater Piping One Heater, Multiple Tanks Water Heater Piping Multiple Heaters, Multiple Tanks Main Power Temperature Control BoilerTemperature Control Water Heater Electrical ConnectionsTemperature Control Features Internal Water Heater Temperature ControlTemperature Setpoint Differential SettingOffset Throttling RangeMinimum Output Setting Integration ConstantMixing System and Control Control Parameter Possible InterferenceWiring Diagrams External Control ConnectionsWiring Diagram, Size 1200, Standard and Codes a and F Βρυτε Μαγνυμ Wiring Diagram, Size 1200, Code B Wiring Diagram, Sizes 1600, 2000 and 2400, Code B Wiring Schematic, Model 1200, Standard and Codes a and F Wiring Schematic, Model 1200, Code B Operating Instructions Operating the Burner and Set UpFilling the Boiler System Gas/Air Test Panel Maintenance System MaintenanceAppliance Maintenance Component Description Shutting Down the Brute MagnumGas Trains Filter BurnerModulating Gas Valve Safety Gas Valve Manual Reset High Limit ControlAuto Reset Temperature Limit Mixing ControlIgnitor / Flame Sensor Assembly Flow SwitchMixing Actuator Ignition ControlTroubleshooting Motorized Safety ValveGas Pressure Switches Sequence of OperationResolving Lockouts Delayed Ignition Possible CausesShort Cycling Boiler Short Cycling Water Heater Replacement PartsHigh Gas Consumption Parts List Combustion Components See FigureElectrical Components See Figure Jacket See Figure Combustion Components Gas Train/Combustion Air Components Gas Train Components Electrical Components Heat Exchanger / Water Path Components Heat Exchanger / Water Path Components Jacket Components Litho in U.S.A. Bradford White 1102 Document