Bradford-White Corp BRHHH, BRHHV warranty Gas/Air Test Panel

Page 37

Βρυτε Μαγνυμ

Page 37

 

Figure 25. Gas/Air Test Panel.

Valve

Shown

Closed

Valve

Shown

Open

Figure 26. Test Panel Valves.

panel are closed (see Figure 26).

5.Remove the two plugs from the + and – ports of the air orifice taps, thread hose barbs into the 1/8" NPT connections, and attach the manometer pressure lines to the barbs. Be sure all connections are gas tight.

6.Switch on the appliance power switch located on the front of the unit.

7.The Brute Magnum will enter the start sequence. The blower and pump come on for pre-purge, then the ignitor warm-up sequence starts and after all safety devices are verified, the gas valve opens. If ignition doesn’t occur, check that there is proper gas supply. Wait 5 minutes and start the unit again.

8.Open air orifice test port valves. Check air orifice differential at full fire, and make note of the differential.

9.Switch the Brute Magnum off.

10.Close air orifice valves, remove the barbs and replace the plugs. Make sure the connections are gas tight.

11.Remove the two plugs from the + and – ports of the gas orifice taps, thread hose barbs into the 1/8" NPT connections, and attach the manometer pressure lines to the barbs. Be sure all connections are gas tight.

12.Switch on the appliance power switch located on the front of the unit.

13.The Brute Magnum will enter the start sequence. The blower and pump come on for pre-purge, then the ignitor warm-up sequence starts and after all safety devices are verified, the gas valve opens.

14.Open gas orifice test port valves. Check gas orifice differential at full fire, and make note of the differential.

15.Close gas orifice valves, remove the barbs and replace the plugs. Make sure the connections are gas tight.

16.If gas and air orifice differentials match what is shown in Table 7, and do not differ from each other by more than 0.1" w.c., the unit is properly set up. If not, consult, the factory.

17.After placing the appliance in operation, the Burner Safety Shutoff Device must be tested. To test:

(a)Close gas shutoff valve with burner operating.

(b)The flame will go out and blower will continue to run for the post purge cycle. One additional attempt to light will follow including pre-purge, ignitor on, valve/flame on and post purge. Ignition will not occur as the gas is off. The ignition control will lockout, and will have to be reset before the unit will operate.

Image 37
Contents Βρυτε Μαγνυμ Βραδφορδ Ωηιτε Χορπ Maintenance Table of ContentsTroubleshooting Replacement PartsList of Figures List of TablesIntroduction General InformationModel Identification Model DesignationDimensions WarrantyLocating the Appliance Inches 91cm horizontally Combustion Air Venting and Combustion AIRCombustion Air From Room Intake Combustion AirLocating Vent & Combustion Air Terminals VentingHorizontal Vent Terminal Combustion Air and Vent Through Side Wall From Massachusetts Rules and Regulations 248 CMR Installation of Carbon Monoxide DetectorsSide Wall Combustion Air Terminal Common Vent Test BoilersVertical Vent Terminal Vertical Combustion Air TerminalDistance from Gas Meter or Last Stage Regulator GAS Supply and Piping4A.1 Heating System Piping Hot Supply Connections Boiler Water Connections Brute Magnum Boiler4A.2 Cold Water Make-Up Boiler 4A.3 Freeze Protection Boiler Water Connections Brute Magnum Water Heater4B.1 Water System Piping Water Heater 4B.2 Hot Water Supply Piping Water HeaterHydronic Piping Multiple Boilers 4B.3 Water Flow Requirements Water HeaterHydronic Piping Multiple Boilers Alternate 4B.4 Combined Water potable Heating and Space Heating Hydronic Piping One Boiler, Multi-Temperature System4B.5 Freeze Protection Water Heater Heater or in the pipes in the system. When waterWater Heater Piping One Heater, One Tank Water Heater Piping Multiple Heaters, One Tank Water Heater Piping One Heater, Multiple Tanks Water Heater Piping Multiple Heaters, Multiple Tanks Temperature Control Boiler Main PowerTemperature Control Water Heater Electrical ConnectionsInternal Water Heater Temperature Control Temperature Control FeaturesTemperature Setpoint Differential SettingThrottling Range OffsetIntegration Constant Minimum Output SettingControl Parameter Possible Interference Mixing System and ControlExternal Control Connections Wiring DiagramsWiring Diagram, Size 1200, Standard and Codes a and F Βρυτε Μαγνυμ Wiring Diagram, Size 1200, Code B Wiring Diagram, Sizes 1600, 2000 and 2400, Code B Wiring Schematic, Model 1200, Standard and Codes a and F Wiring Schematic, Model 1200, Code B Operating Instructions Operating the Burner and Set UpFilling the Boiler System Gas/Air Test Panel System Maintenance MaintenanceAppliance Maintenance Component Description Shutting Down the Brute MagnumGas Trains Filter BurnerModulating Gas Valve Manual Reset High Limit Control Safety Gas ValveAuto Reset Temperature Limit Mixing ControlFlow Switch Ignitor / Flame Sensor AssemblyMixing Actuator Ignition ControlMotorized Safety Valve TroubleshootingGas Pressure Switches Sequence of OperationResolving Lockouts Delayed Ignition Possible CausesShort Cycling Boiler Short Cycling Water Heater Replacement PartsHigh Gas Consumption Combustion Components See Figure Parts ListElectrical Components See Figure Jacket See Figure Combustion Components Gas Train/Combustion Air Components Gas Train Components Electrical Components Heat Exchanger / Water Path Components Heat Exchanger / Water Path Components Jacket Components Litho in U.S.A. Bradford White 1102 Document