Ariston 41-116-04 installation instructions Model

Page 13

FIG. 3.4

TABLE 3.1

Wiring to 3 port valve installation using an external 2 channel programmer

Type Danfoss FP715 Type Honeywell ST6400C

NOTE: When using a 3 port valve installation in conjunction with an unvented cylinder it will be necessary to use a 2 port valve on the cylinder flow connection in addition to the 3- port valve to satisfy Building Regulations.

Technical Data

Capacity

Coil

C.H.W.

D.H.W.

Max Heating

Heat Ioss

 

 

Surface

Flow/rate

Flow/rate

Output

 

MODEL

It.

m2

m3/h

It/h

kW

kWh/24h

Contract STI 125 Indirect

125

0.75

0.5

194

11.3

2

 

 

 

1

266

15.5

 

 

 

 

2

340

19.8

 

 

 

 

 

 

 

 

Comfort STI 125 Indirect

125

0.75

0.5

256

14.9

2.2

Contract STI 150 Indirect

150

0.93

1

353

20.5

 

 

 

 

2

451

26.2

 

 

 

 

 

 

 

 

Comfort STI 150 Indirect

150

0.93

0.5

256

14.9

2.4

Contract STI 210 indirect

200

0.93

1

353

20.5

 

 

 

 

2

451

26.2

 

 

 

 

 

 

 

 

Comfort STI 210 Indirect

200

0.93

0.5

256

14.9

2.9

Contract STI 300 Indirect

300

0.93

1

353

20.5

 

 

 

 

2

451

26.2

 

 

 

 

 

 

 

 

SB 125 Indirect

125

1

0.5

190

11

1.72

 

 

 

1

318

18.5

 

 

 

 

2

496

28.8

 

 

 

 

 

 

 

 

SB 150 Indirect

150

1

0.5

190

11

1.75

 

 

 

1

318

18.5

 

 

 

 

2

496

28.8

 

 

 

 

 

 

 

 

SB 200 Indirect

200

1.3

0.5

190

11

2.1

 

 

 

1

318

18.5

 

 

 

 

2

496

28.8

 

 

 

 

 

 

 

 

13

Image 13 Contents
Installation Instructions Type C Boilers Table of Contents General Instructions Overall View InstallationReference Standards Siting the Appliance Overall DimensionsClearances Mounting the Appliance Electrical ConnectionWater Connections GAS ConnectionResidual Head of the Boiler Tower Flue Components Flue Connections Room Thermostat Connection RffiOn/Off Switch Electrical DiagramGAS and Water Circuits H.W. Storage Cylinder 2 Port and 3 Port Valve InstallationsModel Domestic HOT Water Priority KIT CommissioningInitial Preparation Removing the Front Panel Control PanelFume Discharge Monitoring Initial START-UP Combustion AnalysisBoiler Safety Systems Draining the System Rffi GAS AdjustmentsChanging the Type of GAS Maintenance Number 41-116-04 Technical InformationServicing Instructions Type C Boilers Fault Finding To Gain General Access Replacement of PartsServicing Instructions Removing the front panelRemoving the side panels Removing the sealed chamber front coverRemoving the combustion cover Access to the Combustion ChamberRemoving the burner and jets Removing the electrodesRemoving the main heat exchanger Removing the fan Removing the air pressure switchServicing and Removal of the GAS Valve Setting the gas pressuresRffi Removing the gas valve Removing the spark generatorRemoving the safety valve Removing the pump pressure switchAccess to the Water Circuit Removing the automatic air vent 1. Unscrew valve top Z FIGRemoving the pump Removing the expansion vessel Removing the pressure gaugeRemoving the frost thermostat Removing the overheat thermostatRemoving the regulation thermostat Checking the fuse Access to the Control SystemRemoving the P.C.B.s Fault Finding Guide Fault FindingFlow -CHARTS YES Mbar Electrical DiagramsSF008A MicroSYSTEM 10 Rffi Ariston B063 Technical Service Hot Line 01494 23 99 84 1582