HearthStone Quality Home Heating Products Inc | Champlain Model #8300 |
INSTALLATION INSTRUCTIONS
FOR THE STANDARD HORIZONTAL
TERMINATION MINIMUM
VENTING KIT (KIT #93-65000)
1. Install the 4” inner collar by first | › Caution: For | building with vinyl siding, | ||||||||
| placing the 4” x 6” gasket ring onto | a vinyl siding standoff should be installed | ||||||||
| the base of the collar. Install the | between the vent cap and the exterior | ||||||||
| collar and gasket to the stove using 8 | wall. |
|
|
|
|
|
|
| |
| of the screws provided. | 7. | Install |
|
| the | horizontal | vent | ||
|
|
|
|
| ||||||
2. | Install | the outer collar in similar |
| termination on the outside of | the | |||||
| fashion using the larger gasket ring |
| wall. Make sure both of the retaining | |||||||
| and the remaining 8 screws. |
| straps extend through interior wall | |||||||
|
|
|
| thimble. | Before | attaching | the | vent | ||
3. | Install | the 45º elbow over the outer |
| termination to the outside of the | ||||||
| collar. Place the elbow so that the |
| house, run a bead of | |||||||
| twist lock end is pointing up. |
| mastic around its’ outside edges, so | |||||||
|
|
|
| as to make a seal between it and the | ||||||
4. | Install | one of the 24” pipe sections |
| wall. The arrow on the end cap | ||||||
| into the elbow by fully inserting it |
| should point up. Secure the cap to | |||||||
| and turning approximately ¼ turn |
| the wall with the appropriate screws. | |||||||
| clockwise, until the 2 sections are |
|
|
|
|
|
|
|
| |
| fully locked. Install the 90º elbow in | 8. | Place the thimble cover onto the 90º | |||||||
| similar fashion. |
| elbow. Put the 9” pipe into the | |||||||
|
|
|
| horizontal vent cap, (the vent pipe | ||||||
5. | Move | the stove and pipe assembly |
| must extend into the horizontal vent | ||||||
| back until the 90º elbow is flush to |
| cap a minimum of | |||||||
| the wall. The 24” vertical pipe |
| stove and vent pipe into position, | |||||||
| should be parallel to the wall. Draw a |
| insert the 9” pipe into the 90º elbow | |||||||
| circle around the pipe. Use the center |
| and twist to lock it. Secure the straps | |||||||
| of this | circle as the center point of |
| from | the | horizontal vent | termination | |||
| the 10” x 10” square wall pass |
| to the interior pipe with 2 sheet metal | |||||||
| through. (It should be approximately |
| screws, keeping screws close to wall | |||||||
| 55” above the floor) Cut and frame |
| thimble as possible. Bend or cut the | |||||||
| the wall pass through. |
| excess strapping so that the thimble | |||||||
|
|
|
| cover | will | fit | properly. | Screw | the |
6. Place | the | interior | wall | thimble | into | thimble cover to the wall. |
the 10” x 10” wall pass through. |
| |||||
Secure | it | with | 4 | screws | (not |
|
provided). Install the exterior portion of the thimble in similar fashion, overlapping the 2 sections.