Hearth and Home Technologies SOHO-CE manual Vertical Termination No Elbow Two Elbows

Page 13

2. Vertical Termination

No Elbow

V1

Figure 5.6

Two Elbows

V2

V1

H1

V1 = 11.8 m Maximum

Two Elbows

V1 Minimum

 

H Maximum

Elbow only

 

46 cm

30 cm

 

91 cm

 

 

 

61 cm

 

1.2 m

91 cm

 

1.8 m

1.2 m

 

2.4 m

 

 

 

1.8 m

 

4.6 m

 

 

V1 + V2 + H Maximum = 11.9 m

H1 + H2

Maximum = 4.6 m

Figure 5.7

Heat & Glo • Soho-CE2111-900 Rev. D • 6/07

13

Image 13
Contents What to do if you smell gas Model Soho-CEHomeowner Reference Information CongratulationsTable of Contents Appliance Certification Listing and Code ApprovalsNon-Combustible Materials Specification Combustible Materials SpecificationGetting Started Design and Installation ConsiderationsInspect Appliance and Components Tools and Supplies NeededSelecting Appliance Location Framing and Clearances84.1 74.0 118.7 89.2 Clearances Constructing the Appliance ChaseFlue Termination Minimum Clearances Termination LocationsSee .4 for specific clearances Cm minimum in snow regionsAlcove Applications Flue Table Key Flue Information and Diagrams Use of Elbows Measuring StandardsOne Elbow Minimum Maximum Flue Diagrams Horizontal Termination One Elbow Two Elbows+ H Maximum = 11.9 m Maximum = 4.6 m Two Elbows Minimum + H 2 Maximum Elbow only Not AllowedThree Elbows Minimum Maximum Horizontal Termination Three Elbows+ V 2 + H = Maximum = 11.9 m + H 2 Maximum = 4.6 m V1 = 11.8 m Maximum Vertical Termination No Elbow Two ElbowsTwo Elbows V1 Minimum Maximum V1 + V2 + H Maximum = 11.9 mThree Elbows V1 Minimum H1 + H2 Maximum Vertical Termination Three Elbows+ V2 + H1 + H2 Maximum = 11.9 m Maximum = 4.3 m Pipe Clearances to Combustibles Flue Clearances and FramingWall Penetration Framing Combustible Wall PenetrationInstalling Attic Shield Installing the Ceiling FirestopVertical Penetration Framing Securing and Leveling the Appliance Appliance PreparationAssembly of Flue Sections Installing Flue PipeInstall Support Brackets Attach the First Flue Component to Starting CollarsInstalling the Horizontal Termination Cap Installing Firestops and Horizontal Termination CapFor Horizontal Runs Wall shield firestops are Required Install Roof Flashing and Vertical Termination Cap Sharp Edges Assembling and Installing Storm CollarGas Pressure Requirements Gas InformationGas Connection Natural Gas Propane Butane G20 G31 G30 G25Electrical Information Electronic Ignition System WiringFacing Material FinishingMantel Projections See for combustible/non-combustible definitionsClean the Appliance Appliance SetupAccessories Ember PlacementPositioning the Logs Log Assembly LOGS-SOHOCERemoving Glass Assembly Glass AssemblyReplacing Glass Assembly Before Lighting Appliance Operating InstructionsElectronic Ignition Lighting the FireplaceInitial Break-in Procedure Frequently Asked QuestionsAfter Appliance is Lit Symptom Possible Causes Corrective Actions TroubleshootingElectronic Ignition System No transmission, motor Receiver mustMaintaining and Servicing Appliance Maintenance TasksRecommend addition of screen if one is not present Inspect Maintenance TasksVerify no obstructions to airflow through the louvers Operating properly. Replace as necessaryAppliance Dimensions Table Appliance Dimension DiagramReference Materials Location CentimeterLog Set Assembly Service Parts List108 SOHO-CE SOHO-CE Service PartsLimited Lifetime Warranty Heat & GLO GAS Appliance Products Limited Lifetime WarrantyImportant operating Contact Information