Sears N9MP2075B12B1, N9MP2050B12B1 manual Downflow Right Side Vent and Trap, PVC 3/4, Models only

Page 20

Downflow Right Side Vent and Trap

Yellow or black Plastic Cap

/

Vent Drain

&Clamps

SIDE VIEW

,_Rotatedownward

Splice Connector

Barbed

Dual Pressure Switch

NOTE.'Built-in channel will be angled 5° to 10° also.

Single Pressure Switch Detail

Drain TubeBlack, sis"

ID Corrugated

PVC 3/4"

Trap Connection

_Clamp ears '_

ointed OUT

Pmassemble& insert intofurnace

3/16" ID

Rubber Tube

Coupling & Clamps

112"ID

Drain Hose &

Clamps

On Some

 

Models ONLY

2" PVCCoupling

 

Either:The PVC

supplied 2" PVC Tee

WARNING

White PVC

Move Caps

(loose partsbag)

to top of

 

trap

 

Drain Tube, (& Clamps) Black, s/8" ID Cut to fit (looseparts bag)

25-24-46

Downflow Right Side Vent and Trap (See Figure 13)

Remove the Drain Tee if installed.

Disconnect the hoses from the Trap assembly, and remove Trap

and Trap mounting bracket from the blower compartment. Using cover plate and gasket provided in the loose parts bag, cover the

hole from the burner compartment to the blower compartment and secure with screws.

Move the caps to the top of the Trap and mount the Trap externally to the right side of the unit using the 2 screws provided.

Connect the corrugated Drain Tube from the transition box to the Trap as shown. If an extension is required, use the black PVC tube connector and the black 5/8" ID Drain Tube in the loose parts bag. Cut tube to length. Secure all connections with clamps.

Connect the drain hose from the Vent Drain to the Trap. If an ex- tension is required, use the black 1/2" OD barbed coupling, con- nect a black 1/2" ID elbow tube and a suitable section of a 1/2" ID drain tube to make connection from the vent drain to the trap. Se- cure all connections with clamps.

Install the vent pipe grommet into the casing

Cut an appropriate length of 2" PVC pipe long, enough to exit the cabinet and connect the vent drain to either:

A standard field supplied 2" PVC tee (N9MP1 and 2 mod- els), or

A 2" PVC coupling fastened onto the Drain Tee ('9MPD models)

Install Tee Trap into bottom section of Tee.

Connect the Tee trap and the main drain line exiting the casing as shown in Figure 18.

Note: It is recommended that all PVC piping and fitting connec- tions be fit up and inspected before final cementing. Both the ex-

ternal Trap and the external Tee Trap must be primed before

operation. Verify all condensate drain connections are securely clamped. A coupling and clamps (in loose part bag) may be installed as shown for future servicing of the vent system.

[_

440 01 1020 04

Image 20
Contents Table of Contents SingleStageKeep This page for future referenceYES NOE YESSafety Rules Location and Clearances InstallationFrozenWater Pipe Hazard Typical Downflow Installation Installation RequirementsTypical Upflow Installation Dimensions & Clearances Leveling Requirements Air Openings and Connecting DuctsCombustion Ventilation Air Venting and Combustion Air Check ExampleUnusually Tight Construction Ventilation AirFor Two Pipe Installation Vent and Combustion Air PipingSingle Pipe N9MP1 Models Direct Vent N9MP2 ModelsTocompensateforoxygenburnedSee.Confined Space Installa Piping Insulation GuidelinesContaminated Combustion Air Vent and Combustion Air Piping GuidelinesSizing Combustion Air and Vent Pipe N9MP1 & *9MPD ModelsVent Termination Clearances Carbon Monoxide POISONING, Fire and Explosion Hazard440O1102004 Clearance Description15cmforappliances10,OOOBTUH3kW,12 CondensateDrain Trap Condensate Drain Trap Freeze ProtectionUpflow Installations Top Vent Upflow Installations Top Vent See FigureUpflowInstallationsVentthru LeftSide Upflow Installations Vent thru Left Side See FigureSwitch Side ViewOnly All ModelsVentthru RightSideAll Models Vent thru Right Side See Figure Inlet 4= Downflow Left Side Vent and Trap SeeFigureDownflow Right Side Vent and Trap Downflow Right Side Vent and Trap See FigurePVC 3/4 Coupling & Clamps 112ID Drain Hose On SomeHorizontal Left Thru Top Horizontal Left-Thru Top SeeHorizontal Left-Side Vent See Figure Horizontal Left-Side VentHorizontal Right thru Top Yellowor black16ID Rubber Tube\\ Relief Tube ExtensionHorizontalRight-SideVent Horizontal Right Side Vent SeeFigureConnecting Tee Trap to Condensate Trap and Main Drain Line Connecting Vent and Combustion Air PipingOpen Tee Tee TrapConnecting Vent Pipes and Termination Proper Sealing Procedure for CombustionVent Pipe Connection Fire HazardUsing Exterior Risers Horizontal TerminationVertical Termination Vent Termination ShieldingMulti Vent Termination Clearances Concentric Vent and Combustion Air Sidewall TerminationSidewall Inlet Vent and Exhaust Air Termination CmbustincncentricRoof -AirTerminationventandManifold Gas Pressure Adjustment Supply PressureGas Supply Pressure IAIternate Input Ratings, USA onlyNatural PressureFor the 50,000, 75,000, 100,000 and 125,000 Btuh Models TaiHigh Altitude Air Pressure Switch General Derating RulesElectrical SHOCK, Fire or Explosion Hazard Changing OrificesGas Piping Requirements Manual shut- offLow Pressure ValveElectrical Wiring InstallationsPower SupplyWiring Humidifier/Electronic Air CleanerFan Delay DIP Switch Settings Fan Timer ConnectionsReduced Furnacelife Hazard Mountedto eithertheleftorrightInstallation Ductwork and FilterSizing InsulationFilter Installation using Optional Filter Rack Downflow Furnace InstallationCombustible Floor Installation Downflow applications, unless installing on nonFurnace Subbase SubbasesforCombustibleFloorsDimensionsFloorDimensions Checks and Adjustments Adjust Pilot BurnerGas SupplyPressure StartupTemperature Rise Check Heating and Continuous BlowerSpeed SameChanging Blower Speed Reduced Furnace Life HazardFurnace Maintenance FIRE, EXPLOSION, or Carbon Monoxide HazardsHeating Request with Gas Supply Line Shut Off Circulating Fan G RequestHeating W Request Gas Valve Diagnostic Codes See Figure Typical Gas Valve HoneywellOFF ThanHoneywell SV9541M Smart Valve Sequence of Operation Honeywell SV9541M Smart Valve Trouble shooting Flashes Flashes + I FlashLED IndicatesConcentric Termination Vent Termination ClearancesConcentric Vent Termination Kit # LED INDICATESCHECK/REPAIRRequiredtocompletetheinstallation TicalterminationispreferredFieldsuppliedpipeandfittingsareRain Cap to Vent Pipe Assembly Concentric Vent and Combustion Air Side TerminationTable for N9MP2 Models 50,000 & 80,000 Btuh Furnaces Roof Overhang25-22-02 Concentric Vent Sidewall AttachmentAir Elbow N9MP2075B12B1 N9MP2080F16B1 N9MP2100F14B1 N9MP2100J20B1 N9MP2125J20B1Denotes Brand 25-23-30General Model SpecificationsSpecifications N9MP1 Specifications N9MP2 Gas & IgnitionSpecifications 9MPD BlowerDataFor 050 Models 3 Ton Units For 075 Models 3 Ton UnitsFor 100 Models Ton 19 & 22314 Units For 080 Models 4 Ton 19 & 22314 UnitsIlttl Neutral tData UI I BKw25-23-95 Key Description Part Functional125J 100J 125JNon-Functional 1GB14B 20B 12B 16B 14BNo. Non-Functional 16B 14B 20B 12BKey Description N9MP1 N9MP2 OsobPart not Illustrated NAHF002LP9MPD Number 080F12B 075F12B 080J16B 100J14B100J20B 128L20B Capacitor,7.SMfd.,370VParts *gMPD KeyDescription No.Non- FunctionalNumber 050F12B 078F12B 080J16B 100J14B 100J2OB 125L20BPart GMPD Non- FunctionalNumber 050F12B 075F12B 080J16B1013816 + Order from Service Parts 44001 Non- Functional Number050F12B 075F12B 080J16B 100J14B IOOJ20B

9MPD100J20B1, N9MP2100J20B1, 9MPD050F12B1, N9MP1100J20B1, N9MP1125J20B1 specifications

The Sears N9MP1075B12B1, N9MPD125L20B1, N9MP1050B12B1, N9MPD080J16B1, and N9MP2125J20B1 are part of the trusted line of gas furnaces manufactured by Sears, specifically designed to deliver reliable heating solutions for residential applications. These models incorporate cutting-edge technology and robust engineering, making them popular choices among homeowners looking for efficiency and comfort.

One of the main features of these models is their high-efficiency operation. With Annual Fuel Utilization Efficiency (AFUE) ratings exceeding 90%, these furnaces convert a significant portion of fuel into usable heat, thereby reducing energy costs. The N9MP series employs a multi-speed blower system that optimizes airflow for enhanced comfort while minimizing noise levels, ensuring a pleasant indoor environment.

The N9MPD125L20B1 and N9MPD080J16B1 variants highlight their adaptability through dual-stage heating capabilities. This technology allows the furnace to adjust its output based on the thermal demands of the home, preventing energy wastage during milder conditions while providing robust heating during extreme cold spells. The two-stage combustion process not only improves comfort but also contributes to lower greenhouse gas emissions.

Durability is another hallmark of these Sears models. With heavy-duty heat exchangers crafted from high-quality materials, they are built to withstand the rigors of regular use. Additionally, the inclusion of advanced safety mechanisms ensures that the system operates securely, reducing potential risks associated with gas furnaces.

The N9MP2125J20B1 model stands out due to its whisper-quiet operation. Homeowners can enjoy a warm home without the disruptive sound commonly associated with traditional heating systems, thanks to the insulated cabinet design and efficient blower operation.

Furthermore, these models come equipped with user-friendly digital thermostats, which allow precise temperature control and programmable settings, enabling homeowners to tailor their heating needs to fit their lifestyle. The compatibility with smart home systems also adds convenience, enabling users to manage their heating remotely, saving even more energy.

In conclusion, the Sears N9MP1075B12B1, N9MPD125L20B1, N9MP1050B12B1, N9MPD080J16B1, and N9MP2125J20B1 gas furnaces exemplify innovation in heating technology. Their energy-efficient designs, advanced features, and durable construction make them reliable choices for homeowners seeking comfort and sustainability in their heating solutions.