Sears N9MP1, N9MP2, 9MPD Checkholesizesbymakingsureitissmallerthan the cou, Using Exterior Risers

Page 28

2. Checkholesizesbymakingsureitissmallerthan the cou-

plings or elbows that will be installed on the outside. The couplings or elbows MUST prevent the pipe from being pushed back through the wall.

3.Extend vent pipe and combustion air pipe through the wall 3/4" to 1" and seal area between pipe and wall.

4.Install the couplings, nipple and termination elbows as shown and maintain spacing between vent and combus- tion air piping as indicated in Figure 19 and Figure 20.

A metal shield is recommended 18" x 18" min. or 18" rain. diame- ter around the vent termination at the exterior wall to protect the

house exterior materials from flue product or condensation (freez- ing) damage.

Using Exterior Risers

1.Install elbows and pipe to form riser as shown in Figure 20.

2.Secure vent pipe to wall with galvanized strap or other rust resistant material to restrain pipe from moving.

3.Insulate pipe with Armaflex or equivalent moisture resis- tant closed cell foam insulation or Fiberglass insulation if boxed in and sealed against moisture.

ii

Sidewall

 

Termination

with

Exterior

Fi_2_

: Risers

to

Get

Above

Snow

Level or

 

Grade

Level

 

 

 

 

8" _

_

/

18 Mmtmumfor coldchmates

 

MIN. J

/

_-_

(substainedbelow0° F)

 

20' _'_

 

 

 

 

 

:=

%. /

8NOW LEVEL

_=Sq30-04F

Vertical Termination

1.Figure 21 shows the proper installation and clearances for

vertical vent termination. The vertical roof termination should be sealed with a plumbing roof boot or equivalent flashing. The inlet of the intake pipe and end of the exhaust vent must be terminated no less than 12" above the roof or

snow accumulation level, and 12" away from a vertical wall or other protrusion.

2.If the vent system is installed in an existing chimney make sure clearances shown in Figure 21 are maintained. Hori-

zontal section before the termination elbow can be ex- tended on the inlet air to provide necessary clearance.

Rooftop Termination

A = 12" Above roofor snow accumulationlevel

B = 8" Min.,20'Maximum,except in areaswith extreme cold temperatures (sustainedbelow 0°% the 18" Min.

Vent Termination Shielding

Under certain wind conditions some building materials may be af- fected by flue products expelled in close proximity to unprotected surfaces. Sealing or shielding of the exposed surfaces with a cor- rosion resistant material (such as aluminum sheeting) may be re-

quired to prevent staining or deterioration. The protective material should be attached and sealed (if necessary) to the building be- fore attaching the vent terminal.

Multi Vent Termination Clearances

When two (2) or more furnaces are vented near each other, each furnace must be individually vented.

Two (2) vent terminations may be installed as shown in Figure 22, Figure 23, Figure 24, Figure 25, Figure 26 and Figure 27, but the next vent termination must be at least 36" away from first 2 terminations. It is important that vent terminations be

made as shown to avoid recirculation of flue gases.

Concentric Vent and Combustion-

Air Roof Termination

12"Min. Grade orl Snow Level

Combustion

Air

Dimension "A" is touching or 2" maximum separation.

[_

44001 111400

Image 28
Contents SingleStage Denotes Brand MP D 0 75 F 12 a #JellJill 440 01 1114Date of Start-Up Furnace/Drip- Leg? YESCO2 ? Frozen Water Pipe Hazard Frozen and Burst Water Pipe HazardInstallation Typical Upflow InstallationLocation and Clearances Winter ShutdownInstallation Requirements Installation PositionsFurnace Installation Considerations LevelingDimensions & Clearances VENTrgMPDAiRI.TAKE TOPCombustion & Ventilation Air For Single Pipe Installation Air Openings and ConnectingDuctsHorizontal Furnace Installation Confined Space Installation RequirementsEhr Unconfined Space InstallationFree Area Venting and Combustion Air Check Vent CheckMake the Following Check HoodVent and Combustion Air Piping Single Pipe N9MP1 ModelsDirect Vent N9MP2 Models Dual Certified gMPDModelsPiping Insulation Guidelines Sizing Combustion Air and Vent PipePipe Diameter Table N9MP2 Models Vent Termination ClearancesCondensate Drain Trap Condensate Drain Trap Freeze ProtectionUnited States Only Canada See Canadian Fuel Gas Code OtherThanUpflow Installations Dual Certified *9MPD-A4 Models YellowPlasticCapDrainLine TransitionMountingScrews4 SomemodelsDrain HorizontalLeft Installations Dual Certified *9MPD-A4Models 25-24-12Switch Hose Si.g.Pre...reSwitchRpeept.oT \ e.spre X3L/\Page ReturnAir Page Left Side Venting Drainstubonthetransitionandsecurewitha3/4clamp Satetrapandsecurewitha3/4clamp Boxandsecurewitha3/4clampStubonthecondensatetrapandsecurewitha3/4clamp Inlet VentFitting TPipe & ClampsReturn Air Modelsshownhave Twopressureswitches CapReturn Air ClampsLeft Connecting Vent and Combustion Air Piping Combustion Air Pipe Connection Dual Certified orVent Pipe Connection PVCHorizontal Termination Proper Sealing Procedure for Combustion BlowerVent Pipe Using Exterior Risers Checkholesizesbymakingsureitissmallerthan the couVertical Termination Vent Termination ShieldingEi271Recommended Alternate Installation for Sustained Cold Concentric Vent and Combustion Air Sidewall TerminationSidewall Inlet Vent and Exhaust Air Termination Rooftop Inlet Vent and Exhaust Air TerminationManifold Gas Pressure Adjustment Alternate Btuh Input RatingsUSA OnlySupplyPressure Gas Supply PressureHigh Altitude Air Pressure Switch Changing Orifices for High AltitudeGeneral Derating Rules Changing OrificesTypical Gas Piping for Upflow Natural Gas Input Rating CheckExample Electrical Wiring Power SupplyWiringHumidifier/Electronic Air Cleaner Gas Piping RequirementsInstallation Fan Delay DIP Switch SettingsFan Timer Connections Ductwork and FilterFilter Installation using Optional Filter Rack SizingInsulation FiltersCombustible Floor Installation Availablefromyourdistributor StandoffFilterRackAddition Of Air Conditioning Ubbase for Combustible FloorFurnace Subbase Coil CabinetChecks and Adjustments Adjust Pilot BurnerTemperature Rise Check Main Burner Flame CheckTochecktemperaturerise,usethefollowingprocedure Heating and Continuous BlowerSpeed the SameChanging Blower Speed Continuous Fan OperationGas Valve Diagnostic Codes See Figure Circulating Fan G RequestHeating Request with Gas Supply Line Shut Off OFFTypical Gas Valve Honeywell Honeywell SV9541M Honeywell SV9541M Smart Valve Trouble shooting FlashesFlashes + Flashes + SoftLockoutVent Termination Clearances Concentric TerminationConcentric Vent Termination Kit # Arerequiredtocompletetheinstallation Concentric Vent Roof InstallationConcentric Termination Kit NAHA001CV & NAHA002CV Venting Rain Cap to Vent Pipe AssemblyConcentric Vent and Combustion Air Side Termination Concentric Vent Sidewall Attachment 25-22-02440011114O0 N9MP2075B12A4 N9MP2080F16A4 N9MP2100F14A4 N9MP2100J20A4 N9MP2125J20A4Save This Manual For Future Reference Denotes BrandSpecifications N9MP1 GeneralSpecifications N9MP2 Snap HW HSP HwhspNAHA001LV NAHAO01LV NAHA002LV PSC/I/2 PSC/II23OO Specifications 9MPDNAHA00SLV For 075 Models 3 Ton Units For 100 Models Ton 19 & 22314 UnitsFor 100 Models 5 Ton 223/4 Units For 125 Models 5 Ton UnitsConnection Diagram Disconnect Before Servicing Ladder DiagramD22 = = =@O,c25-23-95 FF18Key Description Part Functional125J 100J 125JO50B 075B 080F LOOF LOOJ 125J IoofLOOJ 125J Non-Functional Number 12A 1GAKeyDescription No. Non-Functional NgMP1 050B 075B 080F 100F 100J 125J Number100F 100J 16A 14A 20AKeyDescription No.Functional Heat Exchanger,Primary Heat Exchanger,SecondaryGMPD Number 050F12AKeyDescription No.Non- Functional Models *9MPDO50F12A4, Natural Gas Replacement part supplied 080J16ANon-Functional Key DescriptionNon- Functional Number

9MPD, N9MP1, N9MP2 specifications

The Sears N9MP2, N9MP1, and 9MPD are prominent models in the realm of residential heating systems, specifically designed to provide efficient and effective heating solutions. These models are part of Sears' commitment to quality and innovation, making them a popular choice among homeowners seeking reliability and performance.

The N9MP2 is a high-efficiency multi-speed gas furnace that boasts an impressive AFUE (Annual Fuel Utilization Efficiency) rating. This feature allows the furnace to convert a significant portion of fuel into usable heat, which effectively translates to lower energy bills for homeowners. The unit is equipped with a two-stage gas valve that provides increased comfort by adjusting the heating output based on demand, ensuring an even temperature throughout the home.

The N9MP1, like its counterpart, is known for its reliability and efficiency. It offers a single-stage operation that is ideal for homes needing consistent heating without the necessity for the more complex stages present in two-stage systems. This model also has a good AFUE rating, making it a cost-effective solution for families looking to reduce their heating expenses. Its design is tailored for easy installation and maintenance, allowing homeowners to keep their heating systems running at optimal performance without hassle.

The 9MPD model takes a step further with its advanced technology integration. It features a sophisticated control board that allows for easier diagnostics and enhanced system management. The 9MPD is also designed with quiet operation in mind, employing advanced sound-reduction technologies to minimize noise levels during heating cycles. Homeowners will appreciate the peace and quiet it brings, particularly in shared living spaces.

All three models are equipped with high-quality insulation and specialized heat exchangers that enhance their thermal efficiency. Additionally, they are designed with safety features such as automatic shut-off systems and robust flame rollout protection, ensuring a safe heating experience.

In terms of characteristics, these models are generally constructed with durable materials, designed to endure harsh weather conditions while providing consistent heating. They can be connected to various home automation systems, which adds to their appeal for tech-savvy consumers.

In conclusion, the Sears N9MP2, N9MP1, and 9MPD represent a comprehensive lineup of reliable, efficient, and technologically advanced heating systems suitable for contemporary homes. Their dedication to performance ensures that homeowners enjoy a warm and energy-efficient environment throughout the chilly seasons.