Sears N9MP2, N9MP1 Electrical Wiring, Gas Piping Requirements, Final Check, Power SupplyWiring

Page 33

4. Relightallappliancesandensureallpilotsareoperating.

NOTE: If meter uses a 2 cubic foot dial, divide results (seconds) by two.

Gas Piping Requirements

NOTE: The gas supply line must be installed by a qualified ser- vice technician in accordance with all building codes, (In the state of Massachusetts, gas supply connections MUST be performed by a licensed plumber or gas fitter).

1.Properly size gas pipe to handle combined appliance load or run gas pipe directly from gas meter or LP gas regulator. Refer to NFGC and ANSI Z223.1 for proper gas pipe size.

2.Install correct pipe size for run length and furnace rating.

3.Measure pipe length from gas meter or LP second stage regulator.

NOTE: Refer to Figure 29 or Figure 30 for the general layout at the furnace. The rules listed apply to natural and LP gas pipe installations.

NOTE: The use of copper tubing for gas piping is NOT approved by the state of Massachusetts.

5.Use ground joint unions and install a drip leg no less than 3" long to trap dirt and moisture before it can enter gas valve.

6.Use two pipe wrenches when making connections to pre- vent gas valve from turning.

7.Install a manual shut-off valve external to furnace casing and tighten all joints securely.

Additional LP Connection Requirements

1.Have a licensed LP gas dealer make all connections at

storage tank and check all connections from tank to fur- Race.

2.If copper tubing is used, it MUST comply with limitation set in National Fuel Gas Code or CGA codes.

3.Two-stage regulation of LP gas is recommended.

Final Check

NOTE: On the Dual Certified or Direct Vent models, install the gas pipe grommet to the furnace side panel with the gas pipe entry. If needed, remove the 2" hole plug and relocate to the open hole in the furnace side panel.

If a flexible connector is required or allowed by

authority having jurisdiction, black iron pipe shall be

installed at gas valve and extended a minimum of 2" outside furnace casing.

4.Use black iron or steel pipe and fittings or other pipe ap- proved by local code.

1.The furnace and the gas valve must be disconnected from the gas supply piping system during any pressure testing of that system at test pressures in excess of 1/2" PSIG. Close the manual shut-off valve before testing at such pressures.

2.When installation is complete, test all pipe connections for leaks with the gas pressure less than 1/2', PSIG to the gas

valve.

3.Apply a commercial soap solution to all joints to test for leaks. Correct any leaks indicated by bubbles.

4, Correct even the smallest leak at once.

5.Check for leaks at gas valve and orifice connections to the burner manifold along with the pilot tube connections to the valve and pilot assembly while the furnace is operating.

6. Electrical Wiring

ELECTRICAL SHOCK HAZARD

Failure to do so can result in death, personal inju- ry and/or property damage.

Turn OFF electric power at fuse box or service

panel before making any electrical connections

and ensure a proper ground connection is made

before connecting line voltage.

Power SupplyWiring

The furnace MUST be electrically wired and grounded in accor- dance with local codes, or in the absence of local codes with the latest edition of The National Electric Code, ANSI N FPA 70 and/or The Canadian Electric Code CSA C22.1.

Field wiring connections must be made inside the furnace con- nection box. A suitable strain relief should be used at the point the wires exit the furnace casing.

Copper conductors must be used. Line voltage wires should be sized for the input amps stated on the rating plate. Furnace should be connected to its own separate circuit.

Thermostat

Thermostat location has an important effect on the operation of the unit. Follow instructions included with thermostat for correct

mounting and wiring.

Low voltage connections to furnace must be made on terminal board to fan control.

44001 111400

Set thermostat heat anticipator in accordance with the Technical Support Manual.

Optional Equipment

All wiring from furnace to optional equipment MUST conform to local codes or, in the absence of local codes with the latest edition

of The National Electric Code, ANSI NFPA 70 and/or The Cana- dian Electric Code CSA C22.1. Install wiring in accordance with

manufacturer's instructions. The wiring MUST have a minimum

temperature rating of 105 ° C.

Humidifier/Electronic Air Cleaner

The furnace is wired for humidifier and/or electronic air cleaner connection.

CAUTION

Do NOT exceed 115V/0.8 amp. maximum current load for

both the EAC terminal and the HUM terminal combined.

NOTE: The humidifier will be powered when the furnace is fired and the circulating air blower comes on. The electronic air cleaner will be powered anytime the air circulating blower is energized.

However, the electronic air cleaner is NOT energized during con- tinuous fan operation controlled by the electronic fan control.

Fan Control

The fan control is preset at the factory with a fixed blower ON delay of 30 seconds in the heating mode. The blower OFF timing is preset at 140 seconds. If desired, the fan OFF delay can be re- set to obtain the longest delay times while still maintaining comfort levels. See "Furnace Wiring Diagram".

Image 33
Contents SingleStage MP D 0 75 F 12 a # Denotes BrandJellJill 440 01 1114Furnace/Drip- Leg? YES Date of Start-UpCO2 ? Frozen and Burst Water Pipe Hazard Frozen Water Pipe HazardTypical Upflow Installation InstallationLocation and Clearances Winter ShutdownInstallation Positions Installation RequirementsFurnace Installation Considerations LevelingVENTrgMPD Dimensions & ClearancesAiRI.TAKE TOPAir Openings and ConnectingDucts Combustion & Ventilation Air For Single Pipe InstallationHorizontal Furnace Installation Confined Space Installation RequirementsUnconfined Space Installation EhrFree Area Vent Check Venting and Combustion Air CheckMake the Following Check HoodSingle Pipe N9MP1 Models Vent and Combustion Air PipingDirect Vent N9MP2 Models Dual Certified gMPDModelsSizing Combustion Air and Vent Pipe Piping Insulation GuidelinesPipe Diameter Table N9MP2 Models Vent Termination ClearancesCondensate Drain Trap Freeze Protection Condensate Drain TrapUnited States Only Canada See Canadian Fuel Gas Code OtherThanYellowPlasticCap Upflow Installations Dual Certified *9MPD-A4 ModelsDrainLine TransitionSomemodels MountingScrews4Drain Dual Certified *9MPD-A4 HorizontalLeft InstallationsModels 25-24-12Si.g.Pre...reSwitch Switch HoseRpeept.oT \ e.spre X3L/\Page ReturnAir Page Left Side Venting Satetrapandsecurewitha3/4clamp Boxandsecurewitha3/4clamp Drainstubonthetransitionandsecurewitha3/4clampStubonthecondensatetrapandsecurewitha3/4clamp VentFitting TPipe & Clamps InletReturn Air Cap Modelsshownhave TwopressureswitchesReturn Air ClampsLeft Combustion Air Pipe Connection Dual Certified or Connecting Vent and Combustion Air PipingVent Pipe Connection PVCProper Sealing Procedure for Combustion Blower Horizontal TerminationVent Pipe Checkholesizesbymakingsureitissmallerthan the cou Using Exterior RisersVertical Termination Vent Termination ShieldingConcentric Vent and Combustion Air Sidewall Termination Ei271Recommended Alternate Installation for Sustained ColdSidewall Inlet Vent and Exhaust Air Termination Rooftop Inlet Vent and Exhaust Air TerminationAlternate Btuh Input RatingsUSA Only Manifold Gas Pressure AdjustmentSupplyPressure Gas Supply PressureChanging Orifices for High Altitude High Altitude Air Pressure SwitchGeneral Derating Rules Changing OrificesNatural Gas Input Rating Check Typical Gas Piping for UpflowExample Power SupplyWiring Electrical WiringHumidifier/Electronic Air Cleaner Gas Piping RequirementsFan Delay DIP Switch Settings InstallationFan Timer Connections Ductwork and FilterSizing Filter Installation using Optional Filter RackInsulation FiltersAvailablefromyourdistributor StandoffFilterRack Combustible Floor InstallationAddition Of Air Conditioning Ubbase for Combustible FloorCoil Cabinet Furnace SubbaseAdjust Pilot Burner Checks and AdjustmentsTemperature Rise Check Main Burner Flame CheckHeating and Continuous BlowerSpeed the Same Tochecktemperaturerise,usethefollowingprocedureChanging Blower Speed Continuous Fan OperationCirculating Fan G Request Gas Valve Diagnostic Codes See FigureHeating Request with Gas Supply Line Shut Off OFFTypical Gas Valve Honeywell Honeywell SV9541M Flashes Honeywell SV9541M Smart Valve Trouble shootingFlashes + Flashes + SoftLockoutConcentric Termination Vent Termination ClearancesConcentric Vent Termination Kit # Concentric Vent Roof Installation ArerequiredtocompletetheinstallationRain Cap to Vent Pipe Assembly Concentric Termination Kit NAHA001CV & NAHA002CV VentingConcentric Vent and Combustion Air Side Termination 25-22-02 Concentric Vent Sidewall Attachment440011114O0 N9MP2100F14A4 N9MP2100J20A4 N9MP2125J20A4 N9MP2075B12A4 N9MP2080F16A4Save This Manual For Future Reference Denotes BrandGeneral Specifications N9MP1Snap HW HSP Hwhsp Specifications N9MP2NAHA001LV NAHAO01LV NAHA002LV PSC/I/2 PSC/II2Specifications 9MPD 3OONAHA00SLV For 100 Models Ton 19 & 22314 Units For 075 Models 3 Ton UnitsFor 100 Models 5 Ton 223/4 Units For 125 Models 5 Ton UnitsDisconnect Before Servicing Ladder Diagram Connection DiagramD22 = = =@O,cFF18 25-23-95Functional Key Description Part125J 100J 125JIoof O50B 075B 080F LOOF LOOJ 125JLOOJ 125J Non-Functional Number 12A 1GANgMP1 050B 075B 080F 100F 100J 125J Number KeyDescription No. Non-Functional100F 100J 16A 14A 20AHeat Exchanger,Primary Heat Exchanger,Secondary KeyDescription No.FunctionalGMPD Number 050F12AKeyDescription No.Non- Functional 080J16A Models *9MPDO50F12A4, Natural Gas Replacement part suppliedKey Description Non-FunctionalNon- Functional Number

9MPD, N9MP1, N9MP2 specifications

The Sears N9MP2, N9MP1, and 9MPD are prominent models in the realm of residential heating systems, specifically designed to provide efficient and effective heating solutions. These models are part of Sears' commitment to quality and innovation, making them a popular choice among homeowners seeking reliability and performance.

The N9MP2 is a high-efficiency multi-speed gas furnace that boasts an impressive AFUE (Annual Fuel Utilization Efficiency) rating. This feature allows the furnace to convert a significant portion of fuel into usable heat, which effectively translates to lower energy bills for homeowners. The unit is equipped with a two-stage gas valve that provides increased comfort by adjusting the heating output based on demand, ensuring an even temperature throughout the home.

The N9MP1, like its counterpart, is known for its reliability and efficiency. It offers a single-stage operation that is ideal for homes needing consistent heating without the necessity for the more complex stages present in two-stage systems. This model also has a good AFUE rating, making it a cost-effective solution for families looking to reduce their heating expenses. Its design is tailored for easy installation and maintenance, allowing homeowners to keep their heating systems running at optimal performance without hassle.

The 9MPD model takes a step further with its advanced technology integration. It features a sophisticated control board that allows for easier diagnostics and enhanced system management. The 9MPD is also designed with quiet operation in mind, employing advanced sound-reduction technologies to minimize noise levels during heating cycles. Homeowners will appreciate the peace and quiet it brings, particularly in shared living spaces.

All three models are equipped with high-quality insulation and specialized heat exchangers that enhance their thermal efficiency. Additionally, they are designed with safety features such as automatic shut-off systems and robust flame rollout protection, ensuring a safe heating experience.

In terms of characteristics, these models are generally constructed with durable materials, designed to endure harsh weather conditions while providing consistent heating. They can be connected to various home automation systems, which adds to their appeal for tech-savvy consumers.

In conclusion, the Sears N9MP2, N9MP1, and 9MPD represent a comprehensive lineup of reliable, efficient, and technologically advanced heating systems suitable for contemporary homes. Their dedication to performance ensures that homeowners enjoy a warm and energy-efficient environment throughout the chilly seasons.