Hearth and Home Technologies 823-0170 - MBK owner manual Outside Air Kit Installation

Page 13

R

Isle Royale Wood Stove

C. Outside Air Kit Installation

Included in Kit: 1 fl ex fl ange; 2 cable ties; oustide air termi- nation cap; mounting screws (Discard the remaining parts).

Items Needed for Installation: 4 inch (102mm) diameter

ex pipe in the length as required for your installation; Phil- lips screwdriver; Silicone sealant; Drills and saws necessary for cutting holes through the wall or fl ooring in your home.

1. Remove all materials from packing box.

2.Mount the fl ex fl ange (with pipe fi tting extending out), over the intake air opening at the rear of stove using the four mounting screws supplied with kit.

3.Cut a 4 inch (102mm) minimum hole in the fl oor or wall to accommodate outside air piping. Use 4 inch (102mm) metal fl ex or rigid piping to directly connect outside air to the unit or into vented crawl space. (Do not put fl ex into a non-vented crawl space).

4.If using fl ex tubing attach cable ties to secure tubing at both ends. Use the supplied termination cap with a rodent screen. Seal between the fl oor or wall and the pipe with silicone to prevent moisture penetration.

OUTSIDE AIR

TERMINATION CAP (contains rodent screen)

FLEX FLANGE

Figure 13.1

NOTE: If you plan to install the optional blower and the outside air kit, complete installation of the outside air kit RST.

D. Installation Of Optional Blower

The blower is shipped fully assembled and ready for installation.

1.Remove 3 Phillips head screws from rear of unit.

2.Using the Phillips head screws, attach blower to lower rear of stove, as shown.

3.Plug blower cord into a grounded outlet. Do not remove ground prong from plug. Route power cord to avoid heat from the stove, or other damage. Do not route cord under or in front of appliance.

4.Adjust the blower speed control to the desired speed.

*The blower speed control for this unit is adjusted at the factory, and normally does not require further adjustment.

Rear Shield

Blower Mounting

Flange

Blower Speed Control

Blower

Mounting

Flange

Rear

Shield

Figure 13.2

November 22, 2011

250-5763E

Page 13

 

 

Image 13
Contents MBK PMH Non-Catalytic, Top-load, Wood HeaterHot glass will cause burns Welcome to the Quadra-Fire Family Isle Royale Wood StoveTable of Contents Appliance Certifi cation Isle Royale Wood Stove Listing and Code ApprovalsBTU & Effi ciency Specifi cations Mobile Home ApprovedIsle Royale Wood Stove Getting Started Fire SafetyWindward Negative PressureVenting Systems Flue Draft ConsiderationsTools And Supplies Needed Inspect Appliance & Components and Pre-Burn Check ListMasonry Chimney Typical Stove SystemsAppliance Dimensions Isle Royale Wood Stove Dimensions and ClearancesClearances To Combustibles UL And ULC For TOP Vent InstallationsHearth Protection Requirements Isle Royale Wood Stove Installation ConsiderationsSee Figure USA Required Canada RecommendedReversible Flue Collar Converting Collar For Rear Vent InstallationRear Flue Defl ector Cover Plate Installation Of Optional Blower Outside Air Kit InstallationItems Needed for Installation 4 inch 102mm diameter Venting Components Isle Royale Wood Stove Chimney RequirementsChimney Systems Air Clearances ComponentsInstructions Chimney Height / Rise and Run Masonry Chimney LinerMasonry Chimney Liner Contd Installing Chimney ComponentsRule Chimney Termination Requirements629M, Standard for Factory Built Chimneys Isle Royale Wood Stove Mobile Home InstallationIsle Royale Wood Stove Appliance Set-Up Adjusting The Blower Speed Control Door Handle AssemblyIsle Royale Wood Stove Operating Instructions Symptoms of Over-FiringOver-Firing Your Appliance Wood Selection and Storage Fire RiskKindling or First Stage Burning ProcessSecond Stage Air Controls Combustible/Non-Combustible MaterialsOperating The Top Loading Option Heat Output SettingsBurn Rates Building a Fire Optional Blower Operating Instructions Frequently Asked QuestionsOpacity Smoke Clear SpaceGeneral Maintenance Glass Cleaning Frequency As desired Cleaning Plated SurfacesDisposal of Ashes Glass Replacement Inspect Firebrick & Replacement InstructionsAppliance Inspection Routine Monthly Quick Reference Maintenance GuideStart Fire Problems Possible Cause Solution Isle Royale Wood Stove Troubleshooting GuideExploded Drawing Part number list on following Service PartsNon-Catalytic, Top-Load Wood Stove#9 Baffl e Assembly Service Parts and AccessoriesStocked At Depot13.9 13.1 13.8 13.2 13.7 13.4 13.3 13.5 13.6 Stocked at Depot #13 Door AssemblyBrick, Uncut Must specify size when ordering Stocked at Depot #19 Brick Assembly19.5 19.3 Accessories Date of Service Performed By Description of Service Service And Maintenance LogWarranty Policy Isle Royale Wood Stove Contact Information