Troubleshooting Guide
Pumping Down
Indoor unit | Liquid side |
|
Open | Outdoor unit |
Gas side
Closed
Lo
CLOSECLOSE
Purge the air
• Procedure
(1)Confirm that both the
–Remove the valve stem caps and confirm that the valve stems are in the raised posi- tion.
–Be sure to use a hexagonal wrench to operate the valve stems.
(2)Operate the unit for 10 to 15 minutes.
(3)Stop operation and wait for 3 minutes, then connect the charge set to the service port of the
–Connect the charge hose with the push pin to the service port.
(4)Air purging of the charge hose.
–Open the
(5)Set the
(6)Operate the air conditioner at the cooling cycle and stop it when the gauge indi- cates 1kg/cm2g.
(7)Immediately set the
–Do this quickly so that the gauge ends up indicating 3 to 5kg/cm2g.
(8)Disconnect the charge set, and mount the
–Use torque wrench to tighten the service port nut to a torque of 1.8 kg.m.
–Be sure to check for gas leakage.
Do not use the existing charge set for
Copyright ©2007 LG Electronics. Inc. All right reserved. | - 46 - |
Only for training and service purposes | LGE Internal Use Only |
|