A.O. Smith 400, 402, 401, 403 Standard Vent Vertical Category, Type B or, Equivalent, 16 40.6 cm

Page 12

STANDARD VENT - VERTICAL (CATEGORY I)

IMPORTANT!

VENT PRESSURE MUST BE MAINTAINED BETWEEN -0.02" W.C. AND -0.04" W.C. AT 24" (61.0 cm) ABOVE BOILER COLLAR.

Figure 6.

TABLE 10. STANDARD VERTICAL VENTING (CATEGORY I)

 

APPLIANCE

CERTIFIED

EXHAUST

MAXIMUM LENGTH

MODEL

CATEGORY

VENTING

VENT SIZE

WITHOUT BAROMETRIC DAMPER

 

 

MATERIAL

INCHES (cm)

FEET (m)

I000

I

TYPE B OR

10”(25.4 cm)

35 Feet (10.7 m) without damper

EQUIVALENT

 

*70 Feet (21.3 m) max. with damper

 

 

 

1300

I

TYPE B OR

 

35 Feet (10.7 m) without damper

1500

EQUIVALENT

12" (30.5 cm)

*70 Feet (21.3 m) max. with damper

 

1850

I

TYPE B OR

14"(35.6 cm)

35 Feet (10.7 m) without damper

2100

EQUIVALENT

 

*70 Feet (21.3 m) max. with damper

 

 

2500

I

TYPE B OR

16" (40.6 cm)

35 Feet (10.7 m) without damper

EQUIVALENT

 

*70 Feet (21.3 m) max. with damper

 

 

 

*Extending venting over 70 feet (21.3 m) may require special considerations.

Connection for the appliance exhaust vent to the stack must be as direct as possible. Maximum and minimum venting length for Category I appliances shall be determined per the latest edition of the National Fuel Code (U.S.) and CAN/CSA-B149.1 Installation Code (Canada).

The horizontal breaching of a vent must have an upward slope of not less than 1/4 inch per linear foot (2 cm/m) from the boiler to the vent terminal. The horizontal portion of the vent shall be supported to maintain clearances and to prevent physical damage or separation of joints.

12

Image 12
Contents Installation Operation Maintenance Limited Warranty Copper Boilers for Hydronic Heating HOT Water SupplyDIMENSIONS/CAPACITIES Data Dimensional DataGAS and Electrical Requirement Dimensions Data for Outdoor Configuration Recovery Capacities ForewordFEATURES/CONTROLS Differential Pressure Switch Combustion AIR Blower Blocked Flue Pressure SwitchWater Flow Switch ON/OFF SwitchInstallation Instructions Safety Relief ValvesRequired Ability LocationInstallation Clearances Chemical Vapor CorrosionLevelling AIR RequirementsVenting Horizontal Vent Installation System Installation Installation AS Boiler ReplacementINTAKE/EXHAUST Installation Requirements GeneralStandard Vent Vertical Category Type B orEquivalent 16 40.6 cmStandard Vent Horizontal Category III StainlessSteel IIIDirect Vent Vertical Exhaust Configurations Direct Vent Vertical CategoryDirect Vent Horizontal Exhaust Configurations Direct Vent Horizontal CategoryStainless GAL. Steel Sealed Stainless GAL.STEELHydronic Installation Space Heating Applications Internal ContaminantsVAC System Controller Optional Tank Probe Installation Procedure GAS Connections Water Line ConnectionsHard Water Conditions Tank Probe OptionalSingle boiler with horizontal tank Single boiler with vertical tank Suggested Pipe Size For Multiple Gas Appliances Propane Gas Single Unit INSTALLATION, Suggested Pipe Size Wiring ConnectionsDistance from Meter BTU Input BTU/HRGAS Manifold Assembly Genesis GB/GW 1000-2500 Series 400 Wiring Diagram Page Genesis GB/GW 1000-2500 Series 400 Schematic Diagram Page CCB Central Control Board FCB Flame Control Board Diagram PDB Power Distribution Board Diagram Operation Filling and Purging Water SystemPurging of GAS Line Inlet GAS PressureFor Your Safety Read Before Operating For Your Safety Read Before Operating Adjustments Risk of Scalds TemperatureSetting Degree Burns on Adult Skin Control SystemAir Pressure Sensors open condition indicates fault Gas Pressure Sensors open condition indicates faultWater Level Sensor open condition indicates fault CCB/FCB Indicator Lamps & FusesCCB Ten Position Dipswitch Central Control Section SW1 CCB-SW2FCB Eight-Position Dipswitch Operating SequenceTemperature Setpoints System Control Algorithm UIM Operating ProceduresStages 1 and 2 will turn on in sequence from 1 to UIM ScreensTemperature Screen Status Displayed True Condition InputMenu Screen System Status ScreenDescription of FCB control states Operating Setpoint Adjustment Procedure High Limit Differential Setpoint Adjustment ProcedureOperating Differentialsetpoint Adjustment Procedure Fault Displayed Description Redled Lockout Hard Main Burners Tank Probe Tank Remote probe shorted or open FlashingDeliming Replacement Parts Tubecleaningprocedure Mechanical Removal of DepositsNEW Boiler Limited Warranty Conditions and ExceptionsTennessee Waltz Parkway, Ashland City, TN Phone