A.O. Smith 402, 400, 401, 403, 405, 404 instruction manual Single boiler with horizontal tank

Page 19

ONE GENESIS (MODEL GW) HOT WATER SUPPLY BOILER WITH HORIZONTAL TANK

INSTALL THERMAL EXPANSION TANK ON COLD WATER SUPPLY LINE, IF CHECK VALVE OR PRESSURE REDUCING VALVE IS USED IN SUPPLY.

PRESSURE RELIEF VALVE RATING SHOULD NOT EXCEED PRESSURE CAPACITY OF ANY COMPONENT IN THE SYSTEM.

PIPING SHOULD CONFORM TO LOCAL CODES.

BALL VALVES ARE SHOWN FOR SERVICING BOILER. HOWEVER, LOCAL CODES SHALL GOVERN THEIR USAGE.

IMPORTANT

WATER FLOW SWITCH PROTECTS THE BOILER IN CASE OF WATER SERVICE INTERRUPTION OR CIRCULATOR FAILURE.

PIPE TO OPEN DRAIN

XFACTORY-INSTALLED ON UNIT == SUPPLIED WITH UNIT

= FIELD-INSTALLED

DANGER

TEMPERATURE SETTING SHOULD NOT EXCEED SAFE USE TEMPERATURE AT FIXTURES. SEE WATER TEMPERATURE CONTROL WARNING ON PAGE 26. IF HIGHER PREHEAT TEMPERATURES ARE NECESSARY TO OBTAIN ADEQUATE BOOSTER OUTPUT, ADD AN ANTI-SCALD VALVE FOR HOT WATER SUPPLIED TO FIXTURES.

WARNING

THE WATER MANIFOLD IS NOT DESIGNED TO SUPPORT THE WEIGHT OF THE WATER PIPING SYSTEM. SPECIAL CARE MUST BE TAKEN TO ENSURE PROPER SUPPORT.

TWO TEMPERATURE WATER MIXING VALVE APPLICATION

CIRCULATING RETURN

LINE CONNECTIONS

TEMPERED WATER LOOP, IF USED, CONNECT TO POINT R.

STORED TEMPERATURE WATER LOOP, IF USED, CONNECT TO ANY OPENING NEAR BOTTOM OF TANK.

 

MINIMUM

MODELS

PIPE SIZE

MODELS

INCHES

GW-1000

 

THRU

2 1/2"

2500

NPT

 

 

FACTORY PUMP SIZING

BASED ON 50 EQUIVALENT

FEET (15.2 m) OF PIPE.

Figure 11. Single boiler with horizontal tank.

Encase field-supplied wires between tank probe and junction box with 1/2" field supplied conduit. "Pigtails" of field- supplied wires should be spliced to "pigtails" of tank probe and connected to 24 VAC junction box. See figure 15. This conduit and wiring should be separate from any other conduit/wiring to guard against EMI (electromagnetic interference).

Figure 12. Tank probe installation.

19

Image 19
Contents Copper Boilers for Hydronic Heating HOT Water Supply Installation Operation Maintenance Limited WarrantyDimensional Data DIMENSIONS/CAPACITIES DataGAS and Electrical Requirement Dimensions Data for Outdoor Configuration Foreword Recovery CapacitiesFEATURES/CONTROLS ON/OFF Switch Differential Pressure Switch Combustion AIR BlowerBlocked Flue Pressure Switch Water Flow SwitchLocation Installation InstructionsSafety Relief Valves Required AbilityAIR Requirements Installation ClearancesChemical Vapor Corrosion LevellingVenting Horizontal Vent Installation General System InstallationInstallation AS Boiler Replacement INTAKE/EXHAUST Installation Requirements16 40.6 cm Standard Vent Vertical CategoryType B or EquivalentIII Standard Vent Horizontal CategoryIII Stainless SteelDirect Vent Vertical Category Direct Vent Vertical Exhaust ConfigurationsStainless GAL.STEEL Direct Vent Horizontal Exhaust ConfigurationsDirect Vent Horizontal Category Stainless GAL. Steel SealedHydronic Installation Internal Contaminants Space Heating ApplicationsVAC System Controller Optional Tank Probe Optional Tank Probe Installation ProcedureGAS Connections Water Line Connections Hard Water ConditionsSingle boiler with horizontal tank Single boiler with vertical tank Suggested Pipe Size For Multiple Gas Appliances Propane Gas BTU/HR Single Unit INSTALLATION, Suggested Pipe SizeWiring Connections Distance from Meter BTU InputGAS Manifold Assembly Genesis GB/GW 1000-2500 Series 400 Wiring Diagram Page Genesis GB/GW 1000-2500 Series 400 Schematic Diagram Page CCB Central Control Board FCB Flame Control Board Diagram PDB Power Distribution Board Diagram Inlet GAS Pressure OperationFilling and Purging Water System Purging of GAS LineFor Your Safety Read Before Operating For Your Safety Read Before Operating Control System AdjustmentsRisk of Scalds Temperature Setting Degree Burns on Adult SkinCCB/FCB Indicator Lamps & Fuses Air Pressure Sensors open condition indicates faultGas Pressure Sensors open condition indicates fault Water Level Sensor open condition indicates faultCCB-SW2 CCB Ten Position Dipswitch Central Control Section SW1Operating Sequence FCB Eight-Position DipswitchUIM Screens Temperature Setpoints System Control AlgorithmUIM Operating Procedures Stages 1 and 2 will turn on in sequence from 1 toSystem Status Screen Temperature ScreenStatus Displayed True Condition Input Menu ScreenDescription of FCB control states High Limit Differential Setpoint Adjustment Procedure Operating Setpoint Adjustment ProcedureOperating Differentialsetpoint Adjustment Procedure Fault Displayed Description Redled Lockout Hard Tank Probe Tank Remote probe shorted or open Flashing Main BurnersDeliming Tubecleaningprocedure Mechanical Removal of Deposits Replacement PartsConditions and Exceptions NEW Boiler Limited WarrantyTennessee Waltz Parkway, Ashland City, TN Phone