A.O. Smith
405, 400, 402, 401, 403, 404
instruction manual
CCB Central Control Board
Install
Wiring Connections
Warranty
Dimension
GAS Manifold Assembly
UIM Operating Procedures
Adjustments
Recovery Capacities
Temperature Screen
Replacement Parts
Page 28
Figure 17. CCB CENTRAL CONTROL BOARD
28
Page 27
Page 29
Image 28
Page 27
Page 29
Contents
Installation Operation Maintenance Limited Warranty
Copper Boilers for Hydronic Heating HOT Water Supply
Dimensional Data
DIMENSIONS/CAPACITIES Data
GAS and Electrical Requirement
Dimensions Data for Outdoor Configuration
Recovery Capacities
Foreword
FEATURES/CONTROLS
Differential Pressure Switch Combustion AIR Blower
Blocked Flue Pressure Switch
Water Flow Switch
ON/OFF Switch
Installation Instructions
Safety Relief Valves
Required Ability
Location
Installation Clearances
Chemical Vapor Corrosion
Levelling
AIR Requirements
Venting
Horizontal Vent Installation
System Installation
Installation AS Boiler Replacement
INTAKE/EXHAUST Installation Requirements
General
Standard Vent Vertical Category
Type B or
Equivalent
16 40.6 cm
Standard Vent Horizontal Category
III Stainless
Steel
III
Direct Vent Vertical Exhaust Configurations
Direct Vent Vertical Category
Direct Vent Horizontal Exhaust Configurations
Direct Vent Horizontal Category
Stainless GAL. Steel Sealed
Stainless GAL.STEEL
Hydronic Installation
Internal Contaminants
Space Heating Applications
VAC System Controller Optional
Tank Probe Installation Procedure
GAS Connections Water Line Connections
Hard Water Conditions
Tank Probe Optional
Single boiler with horizontal tank
Single boiler with vertical tank
Suggested Pipe Size For Multiple Gas Appliances Propane Gas
Single Unit INSTALLATION, Suggested Pipe Size
Wiring Connections
Distance from Meter BTU Input
BTU/HR
GAS Manifold Assembly
Genesis GB/GW 1000-2500 Series 400 Wiring Diagram
Page
Genesis GB/GW 1000-2500 Series 400 Schematic Diagram
Page
CCB Central Control Board
FCB Flame Control Board Diagram
PDB Power Distribution Board Diagram
Operation
Filling and Purging Water System
Purging of GAS Line
Inlet GAS Pressure
For Your Safety Read Before Operating
For Your Safety Read Before Operating
Adjustments
Risk of Scalds Temperature
Setting Degree Burns on Adult Skin
Control System
Air Pressure Sensors open condition indicates fault
Gas Pressure Sensors open condition indicates fault
Water Level Sensor open condition indicates fault
CCB/FCB Indicator Lamps & Fuses
CCB Ten Position Dipswitch Central Control Section SW1
CCB-SW2
FCB Eight-Position Dipswitch
Operating Sequence
Temperature Setpoints System Control Algorithm
UIM Operating Procedures
Stages 1 and 2 will turn on in sequence from 1 to
UIM Screens
Temperature Screen
Status Displayed True Condition Input
Menu Screen
System Status Screen
Description of FCB control states
High Limit Differential Setpoint Adjustment Procedure
Operating Setpoint Adjustment Procedure
Operating Differentialsetpoint Adjustment Procedure
Fault Displayed Description Redled Lockout
Hard
Main Burners
Tank Probe Tank Remote probe shorted or open Flashing
Deliming
Replacement Parts
Tubecleaningprocedure Mechanical Removal of Deposits
NEW Boiler Limited Warranty
Conditions and Exceptions
Tennessee Waltz Parkway, Ashland City, TN Phone
Related pages
Storage time chart for Electrolux ENB 40200 W
Parts List of CASSEI-EMECHANISM Exploded View for Denon DN-730R
Top
Page
Image
Contents