A.O. Smith BTF-75 warranty Power Vent Wiring Schematic Figure

Page 9

A.Remove two screws that secure side plate on control box and remove plate.

B.Cut flexible power cord on inside of control box, as close to inside wall as possible.

F.Be certain that neutral and line connections are not reversed when making these connections. (See Figure 7).

G.Replace side panel and secure with two screws.

C.If flexible cord and strain relief are removed, then opening in box must be covered.

D.Remove plastic cap in top of control box and install

suitable conduit fitting in enclosure.

E.Splice field wiring into existing wiring using code authorized method (wire nuts, etc).

5.The blower discharge adapter is made to accept only straight sections of 3" pipe. To start off with an elbow, a short section of the furnished pipe, a minimum of 2 inches, must be cut and glued into the end of the elbow that will mount on the discharge adapter (see fig. 6).

6.An 1/8 inch bead of high temperature silicone should be applied to the circumference of the discharge adapter just before installing the first section of pipe or elbow.

CAUTION

LABEL ALL WIRES PRIOR TO DISCONNECTION WHEN SERVICING CONTROLS. WIRING ERRORS CAN CAUSE IMPROPER AND DANGEROUS OPERATION. VERIFYPROPEROPERATIONAFTERSERVICING.

POWER VENT WIRING SCHEMATIC - FIGURE 7

9

Image 9
Contents SmartValve is a Registered Trademark of Honeywell Inc Commercial GAS, GLASS-LINED, TANK-TYPE Water HeaterALL Dimensions in Inches ROUGH-IN-DIMENSIONSRecovery Capacities ForewordGeneral Safety Information Table of ContentsInstallation Unconfined Space AIR RequirementsConfined Space Water ConnectionsClosed Water System Venting Single TemperatureRelief Valve Vent Pipe TerminationIf using 4 inch vent pipe If using 3 inch vent pipePlanning the Vent System Number Maximum Elbows Pipe FeetInstallation of Sidewall Vent System Vent Terminal INSTALLATION, SidewallPreparation of Blower Assembly Power Vent Wiring Schematic Figure Installation of Vertical Vent System Installation of Vent SYSTEM, SidewallVent Pipe Preparation Initial PreparationCement PrimerMaking the Joint Step aGAS Connections OperationConnection of GAS Pipe To Operate the HeaterDo not TRY to Light the Burner by Hand WatertemperatureadjustmentWhat to do if YOU Smell GAS Do not TRY to Light the Burner by HandTemperature Regulation MaintenanceWater Temperature Adjusting Dial PurgingPower Venter Maintenance High Temperature CUT-OFF SwitchVenting System ValveTrouble Shooting Service and RepairCondensation Cathodic PROTECTION-ANODEVent Pipe TOO HOT TroubleshootingAbove 170 F Yellow FlameTroubleshooting with the LED OFFFlash YES Check for Proper Voltage ATTurn on GAS Supply Plug Replace HSIClaim Procedure Service and Repair ExpensesTank ALL Other Parts