6 3-Wire Conduit Installation
Remove the 3 screws from the connector block. Insert bare wires between the connector block terminals and movable nuts. Tighten screws securely. Do not remove ground strap connection.
WARNING: Connector block is approved for copper wire connection only. If aluminum wire is used, see note below.
NOTE: ALUMINUM WIRING
a Do not connect aluminum wire to the connector block.
Use copper building wire rated for the correct amperage and voltage to make 3 (three) 3″ copper jumper wires. Connect wire as per Step 6 or 7 depending on number of wires.
b Splice copper wires to aluminum wiring using special connector terminals designed and
Wire used, location and enclosure of splices, etc., must conform to good wiring practices and local codes.
Screw |
|
Connector block | Bare wire tips |
Connector block terminal |
|
Bare wire |
|
Movable nut |
|
Flexible cable |
|
Bracket | Conduit |
|
Safety Information Operating Instructions Installation Instructions Troubleshooting Tips Customer Service
33