GB
•Place the glass jug (10) under the water discharge opening (4).
•Use the red on/off switch (10) to switch the coffee machine on. The red HEATING control light
(18)will go red.
•When the brewing process has completed, use the red on/off switch (10) to switch the coffee machine off. The HEATING control light (18) will go off.
•You can remove the glass jug (10) from the appliance.
•The machine is equipped with a
Use automatic programming to prepare your coffee
•Open the lid (1) and carefully fill the water from the jug into the water tank. You can read the water level on the level display (8). Close the lid (1).
•Place the durable filter (2) or the 1x4 filter bags into the filter holder (3) and close them. If you are using filter bags, do not forget to flap the filter’s edges closed.
•Use the measuring spoon (9) that came with the appliance to scoop the coffee powder into the durable filter (2).
•Place the glass jug (10) under the water discharge opening (4).
•Press the PRO key (13) twice until the LCD display shows (16) SET TIMER.
•Use the HR key (17) and the MIN key (15) to set the start time for the brewing process. Press the HR key (17) to set the desired hour and the MIN key (15) to set the minute. When done, press the PRO key (13) for confirmation. Afterwards, the LCD display will show the current time again.
•Press the AUTO key (12) to activate automatic coffee preparation. The green TIMER control light (14) goes on.
•At the
•After the brewing process has completed, use the red on/off switch (10) to switch off the coffee machine. The HEATING control light (18) will go off.
•You can remove the glass jug (10) from the appliance.
•The machine is equipped with a
•If the coffee machine is not switched off manually, it will switch off automatically approx. 2 hours after the automatic brewing process has finished. The LCD display will show the current time.
•You can cancel the programming at any time by pressing the AUTO key (12). In this case, the green TIMER control light (14) will go off. If you press the AUTO key (12) again, the programming will be reactivated.
•Pressing the red on/off switch (11) will switch on the appliance immediately, and the red HEATING control light (18) will go on.
•You can readjust the programmed start time at any time by pressing the PRO key (13) twice. When done, press the PRO key (13) again to return to the current time display.
GB
CLEANING AND MAINTAINANCE
•You must follow the safety instructions thoroughly.
•Wipe the coffee machine with a damp cloth on a regular basis.
•Depending on how often the coffee machine is used, it must be descaled every 3 to 4 months, using a commercial descaling agent. Follow the manufacturer’s instructions to dilute the agent and apply
•To clean the appliance, flip open the filter holder (3) and remove it sideways.
•The filter holder (3), the durable filter (2) and the glass jug (10) can be cleaned with running water and some cleaning agent.
•Do not use scouring agents or sharp cleaning utensils.
•Under no circumstances should you use gas or solvents to clean the appliance.
TECHNICAL INFORMATION
Operating voltage | : | 230V~ 50 Hz |
Power input | : | 1000 Watt |
GUARANTEE AND CUSTOMER SERVICE
Before delivery our devices are subjected to rigorous quality control. If, despite all care, damage has occurred during production or transportation, please return the device to your dealer. In addition to statutory legal rights, the purchaser has an option to claim under the terms of the following guarantee:
For the purchased device we provide 2 years guarantee, commencing from the day of sale. During this period we will remedy all defects free of charge, which can be demonstrably attributed to material or manufacturing defects, by repair or exchange.
Defects which arise due to improper handling of the device and malfunctions due to interventions and repairs by third parties or the fitting of
7
approved
8