Vulcan-Hart ES25 ML-52642 manual Installation, Unpacking, Location, Leveling

Page 3

Installation, Operation and Care of

MODEL ES, EL & ET STEAM JACKETED KETTLES

KEEP THESE INSTRUCTIONS FOR FUTURE REFERENCE

GENERAL

Your Vulcan steam jacketed kettle is produced with quality workmanship and material. Proper installation, usage and maintenance will result in many years of satisfactory performance.

Vulcan-Hart Company suggests that you thoroughly read this entire manual and carefully follow all of the instructions provided.

INSTALLATION

Prior to installation verify that the electrical service agrees with the specifications on the machine data plate located inside the front cover at the lower left.

UNPACKING

This kettle was inspected before leaving the factory. The transportation company assumes full responsibility for safe delivery upon acceptance of the shipment. Immediately after unpacking, check for possible shipping damage. If the kettle is found to be damaged, save the packaging material and contact the carrier within 15 days of delivery.

LOCATION

Position the kettle in its final location. Check that there are sufficient clearances for operating and servicing the kettle, and for proper clearance of the cover when raised. The kettle draw off faucet should be located near a floor drain.

LEVELING

Place a spirit level on the rim of the kettle with the cover open. Adjust the feet to level the kettle left- to-right and front-to-back.

INSTALLATION CODES AND STANDARDS

Vulcan kettles must be installed in accordance with:

In the United States:

1.Local codes.

2.National Electrical Code ANSI/NFPA-70 (latest edition).

– 3 –

Image 3
Contents Models Table of Contents Location InstallationInstallation Codes and Standards UnpackingFaucet Connection Optional Electrical Data ChartCanada Electrical ConnectionsOperation Before First USEControls Kettle Food DRAW-OFF Valve Using the KettleCleaning Filling the Water JacketSight Glass Assembly Periodic Maintenance MaintenanceThermostat ServiceServicing Procedures General NotesPressure Limit Switch Magnetic ContactorElectric Heating Elements Replace Pressure Gauge Replace On-Off SwitchReplace Signal Light Service and Parts InformationPart Number Description Required Parts ListFor Units Shipped Before DECEMBER, 1980, Consult the Factory Wiring Diagram Wiring Diagram Wiring Diagram Wiring Diagram Dimensions English Dimensions and Service ConnectionsPage Form 30965 Rev. a