GE ZV800 installation instructions Size and CUT Duct Piece, Overlap, Deflector, Hood outlets

Page 16

Installation Instructions

WALL-MOUNTED INSTALLATION—RECIRCULATING

4 MOUNT THE HOOD

Install a wood screw

Mounting

on each side of the

bracket

mounting frame

 

Lift the hood onto the mounting bracket.

Check to be sure it is level.

Install wood screws through the hood and into the wall on each side of the mounting bracket.

Install bottom

mounting

screws

Extend the canopy forward for better access to the rear mounting screw holes.

Install 2 wood screws or fasteners through the bottom of the hood into the wall.

5SIZE AND CUT DUCT PIECE

Hold upper air deflector with duct connector against the

ceiling.

Measure from the bottom of

the air deflector to the top of

 

the hood as shown. Reduce

 

that dimension by 1” to

 

facilitate installation.

 

 

The duct will cover

 

Duct length

and overlap the

Measure

deflector and the

 

length

 

hood outlets.

 

 

 

5SIZE AND CUT DUCT PIECE (cont.)

Cut the duct piece to size and slip onto the bottom of the duct

connector.

Use duct tape to seal and secure

the duct piece to the connector.

Place the assembly over the hood outlet.

Hold the assembly against the ceiling. The penciled centerline should show through the slot in the deflector. Mark the screw holes on the sides of the assembly.

Remove the assembly and drill 1/8” pilot holes into the wall studs.

Enlarge holes that did not enter studs to 3/8” and tap plastic or metal anchors into the holes, flush with the wall.

Mount the assembly onto the hood outlet, push up against the ceiling and install the screws provided.

CAUTION: Do not use sheet metal screws at the hood flange connection. Doing so will prevent proper damper operations. Seal connection with tape only.

ATTENTION : N’utilisez pas de vis autotaraudeuses pour connecter le rabat de la hotte. En utilisant des vis, vous empêchez le bon fonctionnement du volet de fermeture. Scellez la connection uniquement avec du ruban adhésif.

16

Image 16
Contents Installation Instructions Before YOU Begin Contents Product Dimension and Clearance Installation OptionsPower Supply Advance PlanningDuct Piece Dimensions Length Used Duct FittingsRemove the Packaging Tools and Materials Required not SuppliedWall Mount Installations Installation below a CabinetInstallation below Wall Cabinet Hood, depends upon ceiling heightCheck Installation Hardware Contains 10 Phillips head screwsDUCTWORK, Wiring Locations Install Framing for Hood SupportReinstall drywall Duct elbowInstall Mounting Bracket Install Duct BracketPrepare the Hood Mount the HoodConnect Ductwork Connect ElectricalFinalize Installation Install Duct CoversRemove all packaging materials WALL-MOUNTED INSTALLATION-RECIRCULATING Tape the template in position along the penciled lineJunction box Size and CUT Duct Piece OverlapDeflector Hood outletsMounting Screw holes Vent holes Install Filters Charcoal filterThis hood may be installed beneath a wall-mounted cabinet DUCTWORK, WiringCabinet Requirements Install CUT the Opening Install Side L BracketsRemove Side Screw Complete the Installation and Connect Ductwork Install Rear Mounting Screws Remove protective film on the filtersPub. No
Related manuals
Manual 12 pages 61.67 Kb