GE ZV800 DUCTWORK, Wiring Locations, Install Framing for Hood Support, Duct elbow

Page 9

Installation Instructions

WALL-MOUNTED INSTALLATION—VENTED TO THE OUTSIDE

DUCTWORK, WIRING LOCATIONS

Determine the exact location of the vent hood.

Locate the template packed with the literature.

Measure 36” from the floor to the top of the cooking surface. Add hood installation height determined on page 7. Mark that location.

Use a level to draw a straight pencil line on the wall.

3-3/4” centerline to wall FOR CEILING VENT DUCTING

Ceiling

6-1/2” dia. hole

Centerline 3-3/4”

min. above top

mounting bracket

1INSTALL FRAMING FOR HOOD SUPPORT

IMPORTANT Framing must be capable of supporting 100 lbs.

6” min. opening for ductwork

View from rear

cleats

FOR WALL VENT DUCT

holes

Drill 1/8"

Drill 1/8"

Pilot Holes

Pilot Holes

Drill 1/8"

Drill 1/8"

Pilot Holes

Pilot Holes

 

5-1/16"

 

9-5/8"

13-3/4"

C

 

12-3/4"

L

REAR WALL TEMPLATE

Drill 1/8"

Drill 1/8"

Pilot Holes

Pilot Holes

ALIGN BOTTOM EDGE WITH

8-1/8"PENCIL LINE INDICATING BOTTOM OF THE HOOD.

2-1/16"

49-80271 JR 07-04

Tape the template in position along the penciled line. CHECK TO BE SURE THE TEMPLATE IS LEVEL.

Ceiling ducting:

If ductwork will vent straight up to the ceiling:

Use a level to draw a line straight up, from the centerline on the template to the ceiling.

Measure 3-3/4” from the back wall to the centerline of a 6-1/2” hole on the ceiling.

NOTE: If drywall is not present, add drywall thickness to the 3-3/4” dimension.

Wall Ducting:

If ductwork will vent to the rear:

Use a level to draw a line straight up from the centerline on the template.

Measure at least 3-3/4” above the top mounting bracket holes shown on the template to the centerline of a 6-1/2” dia. duct hole. (Hole may be elongated for

duct elbow.)

HOUSE WIRING LOCATION:

The junction box is located on the top right side of the hood.

Wiring should enter the back wall 20” to 26” above the bottom of the hood, and within 4” of the right side of the centerline. Wiring should enter at least 4” above the bracket on the right side.

9

1” x 6” min.

mounting

support

Centerline of

installation

space

If drywall is present, mark the screw hole locations for the top mounting brackets. Remove the template.

Cut away enough drywall to expose 2 vertical studs at the bracket location indicated on the template.

Install a horizontal support at least 1” x 6” between two wall studs at the top bracket installation location.

The horizontal support must be flush with the room side of the studs. Use cleats behind both sides of the support to secure to wall studs.

Reinstall drywall.

Image 9
Contents Installation Instructions Before YOU Begin Product Dimension and Clearance Installation Options ContentsAdvance Planning Power SupplyDuct Fittings Duct Piece Dimensions Length UsedTools and Materials Required not Supplied Remove the PackagingInstallation below a Cabinet Wall Mount InstallationsInstallation below Wall Cabinet Hood, depends upon ceiling heightContains 10 Phillips head screws Check Installation HardwareInstall Framing for Hood Support DUCTWORK, Wiring LocationsReinstall drywall Duct elbowInstall Duct Bracket Install Mounting BracketMount the Hood Prepare the HoodConnect Electrical Connect DuctworkInstall Duct Covers Finalize InstallationRemove all packaging materials Tape the template in position along the penciled line WALL-MOUNTED INSTALLATION-RECIRCULATINGJunction box Overlap Size and CUT Duct PieceDeflector Hood outletsMounting Screw holes Vent holes Charcoal filter Install FiltersDUCTWORK, Wiring This hood may be installed beneath a wall-mounted cabinetCabinet Requirements Install Install Side L Brackets CUT the OpeningRemove Side Screw Complete the Installation and Connect Ductwork Remove protective film on the filters Install Rear Mounting ScrewsPub. No
Related manuals
Manual 12 pages 61.67 Kb