Installation Instructions
UNDER-CABINET INSTALLATION
CABINET REQUIREMENTS
This hood may be installed beneath a wall-mounted cabinet.
•If the cabinet has been installed, it must be removed so that wall framing supports can be added.
20” Min.
24” Min.
The cabinet must be at least 20” high between the bottom frame and the inside top. If the cabinet is not 20” from bottom to inside top, a custom cabinet or modifications to a different size cabinet and/or soffit may be required to accommodate the hood housing.
•The cabinet must be 36” wide and at least 12” deep.
•The cabinet must be firmly secured to wall studs or the added framing support and capable of supporting 100 pounds.
DUCTWORK, WIRING
•Determine the exact location of the vent hood.
•Locate the Rear Wall Template packed with the literature.
•Measure 36” from the floor to the top of the cooking surface. Add the
•Use a level to draw a straight pencil line on the wall.
Ceiling
Top frame mounting
screw locations
Drill 1/8" | Drill 1/8" |
Pilot Holes | Pilot Holes |
Drill 1/8" | Drill 1/8" |
Pilot Holes | Pilot Holes |
| |
|
C
L
REAR WALL TEMPLATE
10-3/4”
11-3/4”
19
Drill 1/8" | Drill 1/8" |
Pilot Holes | Pilot Holes |
| ALIGN BOTTOM EDGE WITH |
PENCIL LINE INDICATING | |
| BOTTOM OF THE HOOD. |
•Tape the template in position along the penciled line. Check to be sure the template is level.
•Use the level to draw a line straight up, from the centerline on the template to the ceiling.
•Measure
NOTE: If drywall is not present, add drywall thickness to the
HOUSE WIRING LOCATION:
•The junction box is located on the top right side of the hood.
•Wiring should enter the back wall 20” to 26” above the bottom of the hood, and within 4” of the right side of the centerline. Wiring should enter at least 4” above the right side of the frame.