GE ZV800 installation instructions Cabinet Requirements, DUCTWORK, Wiring

Page 19

Installation Instructions

UNDER-CABINET INSTALLATION

CABINET REQUIREMENTS

This hood may be installed beneath a wall-mounted cabinet.

If the cabinet has been installed, it must be removed so that wall framing supports can be added.

20” Min.

24” Min.

The cabinet must be at least 20” high between the bottom frame and the inside top. If the cabinet is not 20” from bottom to inside top, a custom cabinet or modifications to a different size cabinet and/or soffit may be required to accommodate the hood housing.

The cabinet must be 36” wide and at least 12” deep.

The cabinet must be firmly secured to wall studs or the added framing support and capable of supporting 100 pounds.

DUCTWORK, WIRING

Determine the exact location of the vent hood.

Locate the Rear Wall Template packed with the literature.

Measure 36” from the floor to the top of the cooking surface. Add the pre-determined hood installation height. Mark that location.

Use a level to draw a straight pencil line on the wall.

3-3/4” centerline to wall

Ceiling

Top frame mounting

screw locations

19-1/2”

13-3/4"

12-3/4"

Drill 1/8"

Drill 1/8"

Pilot Holes

Pilot Holes

Drill 1/8"

Drill 1/8"

Pilot Holes

Pilot Holes

 

5-1/16"

 

9-5/8"

C

L

REAR WALL TEMPLATE

10-3/4”

11-3/4”

19

Drill 1/8"

Drill 1/8"

Pilot Holes

Pilot Holes

 

ALIGN BOTTOM EDGE WITH

8-1/8"

PENCIL LINE INDICATING

 

BOTTOM OF THE HOOD.

2-1/16"

49-80271 JR 07-04

Tape the template in position along the penciled line. Check to be sure the template is level.

Use the level to draw a line straight up, from the centerline on the template to the ceiling.

Measure 3-3/4” from the back wall to the centerline of a 6-1/2” hole on the ceiling.

NOTE: If drywall is not present, add drywall thickness to the 3-3/4” dimension.

HOUSE WIRING LOCATION:

The junction box is located on the top right side of the hood.

Wiring should enter the back wall 20” to 26” above the bottom of the hood, and within 4” of the right side of the centerline. Wiring should enter at least 4” above the right side of the frame.

Image 19
Contents Installation Instructions Before YOU Begin Product Dimension and Clearance Installation Options ContentsAdvance Planning Power SupplyDuct Fittings Duct Piece Dimensions Length UsedTools and Materials Required not Supplied Remove the PackagingHood, depends upon ceiling height Wall Mount InstallationsInstallation below a Cabinet Installation below Wall CabinetContains 10 Phillips head screws Check Installation HardwareDuct elbow DUCTWORK, Wiring LocationsInstall Framing for Hood Support Reinstall drywallInstall Duct Bracket Install Mounting BracketMount the Hood Prepare the HoodConnect Electrical Connect DuctworkFinalize Installation Install Duct CoversRemove all packaging materials Tape the template in position along the penciled line WALL-MOUNTED INSTALLATION-RECIRCULATINGJunction box Hood outlets Size and CUT Duct PieceOverlap DeflectorMounting Screw holes Vent holes Charcoal filter Install FiltersThis hood may be installed beneath a wall-mounted cabinet DUCTWORK, WiringCabinet Requirements Install CUT the Opening Install Side L BracketsRemove Side Screw Complete the Installation and Connect Ductwork Remove protective film on the filters Install Rear Mounting ScrewsPub. No
Related manuals
Manual 12 pages 61.67 Kb