GE ZV800 installation instructions Mounting Screw holes Vent holes

Page 17

Installation Instructions

WALL-MOUNTED INSTALLATION—RECIRCULATING

6 CONNECT ELECTRICAL

Verify that power is turned off at the source.

WARNING: If house wiring is not 2-wire with a ground wire, a ground must be provided by the installer. When house wiring is aluminum, be sure to use U.L. approved anti-oxidant compound and aluminum-to-copper connectors.

ADVERTISSEMENT

Si la maison n’est pas câblee avec deux fils et un fil

de terre, l’installateur doit installer un fil de terre. Quand les fils sont en aluminium, il faut prendre soin d’utiliser des connecteurs aluminium à cuivre avec une pâte antioxydante approuvée par U.L.

Remove junction box cover and knockout.

Use a conduit connector to secure the conduit to the junction box.

Connect white leads to branch circuit white lead.

Connect black leads to branch circuit black lead.

Connect green/yellow leads to branch circuit green lead or bare ground lead.

Secure all connections with wire nuts on each electrical connector.

Push wires into junction box and replace cover. Be sure wires are not pinched.

Secure electrical panel cover with original screws.

7 INSTALL DUCT COVERS

Place the decorative duct covers on top of the hood.

NOTE: The inside piece has holes on one end intended for use when the hood is installed for recirculating purposes.

Be sure the vented end is at the top, the vent holes will be visible in this installation.

The inside duct piece must slip into the folded ends on the outer section.

Mounting

screw holes

Vent holes

Install 2 screws, duct cover and into ceiling bracket

Install

2 bottom duct cover screws

Extend the inner duct piece upwards to the ceiling mounted air deflector.

Secure the duct cover to the air deflector, driving one screw on each side.

Locate the screw holes on the bottom outside edge of the hood.

Secure the lower duct cover to the hood by installing 2 screws from the bottom of the hood into the duct cover.

17

Image 17
Contents Installation Instructions Before YOU Begin Product Dimension and Clearance Installation Options ContentsAdvance Planning Power SupplyDuct Fittings Duct Piece Dimensions Length UsedTools and Materials Required not Supplied Remove the PackagingInstallation below a Cabinet Wall Mount InstallationsInstallation below Wall Cabinet Hood, depends upon ceiling heightContains 10 Phillips head screws Check Installation HardwareInstall Framing for Hood Support DUCTWORK, Wiring LocationsReinstall drywall Duct elbowInstall Duct Bracket Install Mounting BracketMount the Hood Prepare the HoodConnect Electrical Connect DuctworkRemove all packaging materials Install Duct CoversFinalize Installation Tape the template in position along the penciled line WALL-MOUNTED INSTALLATION-RECIRCULATINGJunction box Overlap Size and CUT Duct PieceDeflector Hood outletsMounting Screw holes Vent holes Charcoal filter Install FiltersCabinet Requirements DUCTWORK, WiringThis hood may be installed beneath a wall-mounted cabinet Install Remove Side Screw Install Side L BracketsCUT the Opening Complete the Installation and Connect Ductwork Remove protective film on the filters Install Rear Mounting ScrewsPub. No
Related manuals
Manual 12 pages 61.67 Kb