GE ZV800 Wall Mount Installations, Installation below a Cabinet, Installation below Wall Cabinet

Page 7

Installation Preparation

WALL MOUNT INSTALLATIONS

These hoods may be installed onto a wall or below a wall cabinet.

Telescopic duct covers are provided to conceal the ductwork, running to the ceiling.

This hood can be installed for recirculating operation. No kits required.

24” Min.

30” Max.

36” Min.

The vent hood must be installed 24” min. and 30” max. above the cooking surface. The hood installation height, from the cooking surface to the bottom

of the hood, depends upon ceiling height.

INSTALLATION BELOW A CABINET

*20” Min.

24” Min.

*The cabinet must measure at least 20” from the bottom frame to the inside top. The hood housing will occupy the interior cabinet space.

Wall Mount ZV800 Installation Heights

Actual

 

*Possible

Celing

*Possible VENTED

RECIRCULATING

Height

Installation Height

Installation Height

 

 

 

7’11”

24” to 27”

24” to 25”

 

 

 

8’ 0”

24” to 28”

24” to 26”

 

 

 

8’ 1”

24” to 30”

24” to 27”

 

 

 

8’ 2”

24” to 30”

24” to 28”

 

 

 

8’ 3”

24” to 30”

24” to 29”

 

 

 

8’ 4”

24” to 30”

24” to 30”

 

 

 

8’ 5”

24” to 30”

24” to 30”

 

 

 

8’ 6”

24” to 30”

24” to 30”

 

 

 

8’ 7”

24” to 30”

24” to 30”

 

 

 

8’ 8”

24” to 30”

24” to 30”

 

 

 

8’ 9”

24” to 30”

24” to 30”

 

 

 

8’ 10”

24” to 30”

24” to 30”

 

 

 

8’ 11”

24” to 30”

24” to 30”

 

 

 

9’ 0”

24” to 30”

24” to 30”

 

 

 

9’ 1”

24” to 30”

24” to 30”

 

 

 

9’ 2”

24” to 30”

24” to 30”

 

 

 

9’ 3”

24” to 30”

24” to 30”

 

 

 

9’ 4”

24” to 30”

24” to 30”

 

 

 

9’ 5”

24” to 30”

24” to 30”

 

 

 

9’ 6”

24” to 30”

24” to 30”

 

 

 

9’ 7”

25” to 30”

24” to 30”

 

 

 

9’ 8”

26” to 30”

24” to 30”

 

 

 

9’ 9”

27” to 30”

24” to 30”

 

 

 

9’ 10”

28” to 30”

24” to 30”

 

 

 

9’ 11”

29” to 30”

25” to 30”

 

 

 

10’

30”

26” to 30”

 

 

 

*Based on 36” countertop height.

INSTALLATION BELOW

A WALL CABINET

Order a cabinet that is at least 20” high from the bottom frame to the inside top. The cabinet must be at least 12” deep.

The hood installation height is determined by the ceiling height.

The hood installation height must be 24” Min. above the cooking surface.

7

Image 7
Contents Installation Instructions Before YOU Begin Product Dimension and Clearance Installation Options ContentsAdvance Planning Power SupplyDuct Fittings Duct Piece Dimensions Length UsedTools and Materials Required not Supplied Remove the PackagingHood, depends upon ceiling height Wall Mount InstallationsInstallation below a Cabinet Installation below Wall CabinetContains 10 Phillips head screws Check Installation HardwareDuct elbow DUCTWORK, Wiring LocationsInstall Framing for Hood Support Reinstall drywallInstall Duct Bracket Install Mounting BracketMount the Hood Prepare the HoodConnect Electrical Connect DuctworkFinalize Installation Install Duct CoversRemove all packaging materials Tape the template in position along the penciled line WALL-MOUNTED INSTALLATION-RECIRCULATINGJunction box Hood outlets Size and CUT Duct PieceOverlap DeflectorMounting Screw holes Vent holes Charcoal filter Install FiltersThis hood may be installed beneath a wall-mounted cabinet DUCTWORK, WiringCabinet Requirements Install CUT the Opening Install Side L BracketsRemove Side Screw Complete the Installation and Connect Ductwork Remove protective film on the filters Install Rear Mounting ScrewsPub. No
Related manuals
Manual 12 pages 61.67 Kb