True Manufacturing Company TR2RRT-2S-2S, TR1RRI-1S installation manual Pilaster INSTALL/OPERATION

Page 13

True Food Service Equipment, Inc.

INSTALLATION / OPERATION INSTRUCTIONS

PILASTER INSTALL/OPERATION CONTINUED...

Installation Procedures (Pilasters):

Install slotted thumb screws into threaded holes along the inside wall of the cabinet.

Slide pilasters into position behind the slotted screws. Leave all of the thumb screws loose for adjustments when installing tray slides.

It is critical to measure from the center of the square hole on the front pilaster to the center hole of the rear pilaster. This measurement should

be 24 5/8” (See Image 13). Do the same on the opposite side of cabinet for single door. Make sure the measurement (24 5/8”) is the same in the center pilasters in 2 and 3 door units. Tap the tray

(Critical Measurement Front to Rear Pilasters)

13

slides into the Pilasters with a rubber Mallet.

Angle & Rod Type shelving uses a 18 1/8” distance between Pilasters. Universal Tray slides have a 21 1/4” distance between Pilasters. (See Image14).

After the pilasters are installed the Universal Tray, Angle Type Tray, and Rod Style Tray Slides will slide into the pilasters (See Images 7-12). When disassembling or changing tray slides a rubber mallet may be used to take out the different tray slides. Gently tap on the under side of the tray slide to loosen it from the pilaster.

Top view (Critical Measurement side to side)

18 1/8”

21 1/4”

Angle Type &

Universal

Rod Type

Tray Slide

14

Type Kit #1 (Angle Type Tray Slide)

Type Kit #2 (Rod Style Tray Slide)

Type Kit #3 (Universal Tray Slide)

7

9

11

8

10

12

11

www.truemfg.com

11

Image 13
Contents TR, TA, & TG Models Spec Series True Food Service Equipment, Inc Safety Precautions USE of Extension Cords Proper Disposal of the RefrigeratorBefore You Throw Away Your Old Refrigerator or Freezer Refrigerant DisposalHOW to Connect Electricity Required Tools Installation / Operation Instructions OwnershipUncrating Wire Gauge for 2% Voltage Drop in Supply Circuits Locating Installation of Legs and CastorsLeveling Warranty is void if ventilation is insufficientSealing Cabinet to Floor OptionalRamp Installation for ROLL-IN Cabinets Electrical Instructions Digital Temperature DisplayStartup Installation Procedures Wire Shelves Pilaster Installation & OperationRequired Tools Installation Procedures Pilasters Pilaster INSTALL/OPERATIONInstalling Shelf Standards in Heated Cabinets See Image Heated Cabinet Shelving INSTALLATION/ OperationTA, TG, TR1R-1S/1F-1S TA, TG, TR2R-2S/2F-2S890140 TA, TG, TR3R-3S/3F-3SFreezers Defrost Time Clock Operation Grasslin Timer Single Door Freezer unit Brush Provided MAINTENANCE, Care & Cleaning Cleaning the Condenser CoilImportant Warranty Information Terms Temperature Control Adjustment for High Altitude onlyStainless Steel Equipment Care and Cleaning Disconnect power to cabinet before Replacing light bulbs Light Bulb ReplacementWarranty Information U.S.A & Canada only