True Food Service Equipment, Inc.
INSTALLATION / OPERATION INSTRUCTIONS
PILASTER INSTALL/OPERATION CONTINUED...
Installation Procedures (Pilasters):
Install slotted thumb screws into threaded holes along the inside wall of the cabinet.
Slide pilasters into position behind the slotted screws. Leave all of the thumb screws loose for adjustments when installing tray slides.
It is critical to measure from the center of the square hole on the front pilaster to the center hole of the rear pilaster. This measurement should
be 24 5/8” (See Image 13). Do the same on the opposite side of cabinet for single door. Make sure the measurement (24 5/8”) is the same in the center pilasters in 2 and 3 door units. Tap the tray
(Critical Measurement Front to Rear Pilasters)
13 |
slides into the Pilasters with a rubber Mallet.
Angle & Rod Type shelving uses a 18 1/8” distance between Pilasters. Universal Tray slides have a 21 1/4” distance between Pilasters. (See Image14).
After the pilasters are installed the Universal Tray, Angle Type Tray, and Rod Style Tray Slides will slide into the pilasters (See Images
Top view (Critical Measurement side to side)
18 1/8” | 21 1/4” |
Angle Type & | Universal |
Rod Type | Tray Slide |
14
Type Kit #1 (Angle Type Tray Slide)
Type Kit #2 (Rod Style Tray Slide)
Type Kit #3 (Universal Tray Slide)
7
9
11
8
10
12
11 | www.truemfg.com | 11 |