True Food Service Equipment, Inc.
INSTALLATION / OPERATION INSTRUCTIONS
HEATED CABINET SHELVING INSTALLATION/ OPERATION
SHELF INSTALLATION:
A.Hook shelf clips onto shelf standards.
B.Position all four shelf clips equal in distance from the floor for flat shelves.
C.Shelves are oriented so that cross support bars are facing down.
D.Place shelves on shelf clips making sure all cor- ners are seated properly.
INSTALLING SHELF STANDARDS IN HEATED CABINETS: (See Image 2)
A.When installing shelf standards make sure the numbers on the standards are facing up. These numbers help with installing shelf clips at a level height.
B.All standards are installed in the upper most
threaded hole near the ceiling of the cabinet. This will leave a threaded hole vacant below each shelf standard. A plastic plug is provided to cover the open threaded slot.
Shelf
Shelf
Clip
Thumb
Screw
Shelf
Standards
Shelf | Image 2 | |
Standards | ||
|
Shelf
Image 1
12 | www.truemfg.com | 12 |