True Manufacturing Company TR1RRI-1S Temperature Control Adjustment for High Altitude only, Terms

Page 20

True Food Service Equipment, Inc.

MAINTENANCE, CARE & CLEANING

TEMPERATURE CONTROL ADJUSTMENT FOR HIGH ALTITUDE ONLY!

TERMS:

Cut-out - Temperature sensed by the controller that shuts the compressor off.

Cut-in - Temperature sensed by the controller that turns the compressor on.

REQUIRED TOOLS

Phillips Head Screwdriver

5/64” or 2 mm Allen Wrench

T-7 Torx Wrench

__________ STEP 1 ___________

Unplug the cooler.

__________ STEP 4 ___________

For high elevation installations, it may be necessary to “warm-up” the set points. To make the adjustment, insert the appropriate tool in each adjustment screw and turn

1/4 of a revolution clockwise (to the right). This procedure will adjust both the cut-in and cut-out about 2°F warmer.

__________ STEP 5 ___________

Make sure to reconnect the pink wire to the proper spade terminal when reinstalling.

__________ STEP 2 ___________

Remove the screws that secure the temperature control to the inset box lower left side of the cabinet (when facing the front of the cabinet).

__________ STEP 3 ___________

Pull out gently from cabinet.

NOTE:

Mechanical temperature

controllers are affected when functioning at high altitude.

The cut-in and cut-out

temperatures will be colder than when the controller functions closer to sea level

Danfoss Temperature Control (High Altitude Only!)

Cut-out Adjustment Screw Allen (5/64” or 2 mm) (clockwise for warmer)

Cut-in Adjustment Screw Torx (T-7) (clockwise for warmer)

Compressor Connection(pink)

Compressor Connection (pink)

18

www.truemfg.com

18

Image 20
Contents TR, TA, & TG Models Spec Series True Food Service Equipment, Inc Safety Precautions Proper Disposal of the Refrigerator USE of Extension CordsBefore You Throw Away Your Old Refrigerator or Freezer Refrigerant DisposalHOW to Connect Electricity Uncrating Installation / Operation Instructions OwnershipRequired Tools Wire Gauge for 2% Voltage Drop in Supply Circuits Installation of Legs and Castors LocatingWarranty is void if ventilation is insufficient LevelingSealing Cabinet to Floor OptionalRamp Installation for ROLL-IN Cabinets Startup Digital Temperature DisplayElectrical Instructions Required Tools Pilaster Installation & OperationInstallation Procedures Wire Shelves Pilaster INSTALL/OPERATION Installation Procedures PilastersHeated Cabinet Shelving INSTALLATION/ Operation Installing Shelf Standards in Heated Cabinets See ImageTA, TG, TR2R-2S/2F-2S TA, TG, TR1R-1S/1F-1STA, TG, TR3R-3S/3F-3S 890140Freezers Defrost Time Clock Operation Grasslin Timer MAINTENANCE, Care & Cleaning Cleaning the Condenser Coil Single Door Freezer unit Brush ProvidedImportant Warranty Information Temperature Control Adjustment for High Altitude only TermsStainless Steel Equipment Care and Cleaning Light Bulb Replacement Disconnect power to cabinet before Replacing light bulbsWarranty Information U.S.A & Canada only