True Food Service Equipment, Inc.
INSTALLATION / OPERATION INSTRUCTIONS
RAMP INSTALLATION FOR ROLL-IN CABINETS
Once the cabinet is in its final location and level the
12
34
8 | www.truemfg.com | 8 |
INSTALLATION / OPERATION INSTRUCTIONS
Once the cabinet is in its final location and level the
12
34
8 | www.truemfg.com | 8 |