ASSEMBLY
3.2 FALCON GTE COMBINATION BOILER
Tools required: | - Phillips head screwdriver | Packaging: the tables below show the numbers of the packages |
| - Wide flat screwdriver | which make up the boiler. The packages are listed in the order in |
| - 13mm spanner | which they are opened for assembly. |
Boiler |
| GTE 4 150 | GTE 5 150 | GTE 4 250 | GTE 5 250 |
|
|
|
|
|
|
|
|
|
|
Boiler Body |
|
|
|
|
|
|
|
delivered loose |
|
|
|
|
|
|
|
- front section |
| 1 | 1 | 1 | 1 |
|
|
- intermediate section | 2 | 3 | 2 | 3 |
|
| |
- rear section |
| 1 | 1 | 1 | 1 |
|
|
- set of assembly rods | - | - | - | - |
|
| |
- accessory package | IL 4 | IL 5 | IL 4 | IL 5 | BUC5039 |
| |
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
Mounted boiler |
| IL 24 | IL 25 | IL 24 | IL 25 |
|
|
body with |
|
|
| ||||
accessories |
|
|
|
|
| BUC5040 |
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
Control Panel - |
| IC 7 | IC 7 | IC 7 | IC 7 |
| |
Standard |
|
| |||||
|
|
|
|
|
| ||
|
|
|
|
|
|
| |
Casing |
| IL 14 | IL 15 | IL 14 | IL 15 |
| |
Domestic Hot | 150 | BH 59 | BH 59 | - | - |
| |
Water Tank | 250 | - | - | BH 9 | BH 9 |
| |
|
|
|
|
|
|
|
|
Front Panel of | tank | - | - | BH 47 | BH 47 |
|
|
|
|
|
|
|
|
| |
Hydraulic Connection | BH 46 | BH 46 | BH 46 | BH 46 |
|
| |
Kit |
|
|
| ||||
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
Domestic Hot |
| AD 127 | AD 127 | AD 127 | AD 127 |
|
|
Water Sensor |
|
|
| ||||
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
The assembly of any optional devices purchased with the boiler is described in the instructions supplied with relevant device or in the control panel instructions.
The list of available optional devices is provided in the applicable price list.
1.Refer to the assembly instructions supplied with the burner.
Buccaneer GT, Falcon GTE - Installation, Assembly & Servicing | 11 |