IDEAL INDUSTRIES BUC5034 manual Buccaneer GT, Falcon GTE Installation, Assembly & Servicing

Page 23

NOTES

Buccaneer GT, Falcon GTE - Installation, Assembly & Servicing

23

Image 23
Contents Installation, Assembly and Servicing General Technical Specifications of Combination Boilers Hreaded Main Dimensions Buccaneer GT Combination BoilerFalcon GTE Combination Boiler Ventilation Installation Installing the BoilerAssembly Boiler LocationConnection of the Domestic Hot Water Circuit InstallationHydraulic Connections Example Buccaneer GT Example of InstallationTools required Assembly Buccaneer GT Combination BoilerAssembling the base and draining tube AssemblyPackage IC1, IC2, IC3 Assembling the boiler onto the tank Installing the pipes Assembling the tank front panelBoiler GTE 4 GTE 5 Assembly Falcon GTE Combination BoilerAssembling the boiler on the hot water tank Installing the tubesAssemble the boiler as instructed in figures 1 Hydraulic Boiler to Tank Connections Kit BH46 AssemblyOperating Principle Assembly ControlsDescription Electrical Connections Fitting and Connecting the MB1 ModuleBoiler Sensor Operating and Installation Package AD127MB1 Domestic Hot Water Sensor Tank SensorInstructions for use Adjusting the timing of the charging pumpAdjusting the limiter thermostat Installation and ConnectionSecuring the module Connections Installation with MB1 ModuleHeating and Domestic Hot Water Installation with MB1 module Connecting the BurnerCommissioning Secondary Circuit Assembly CommissioningStarting Up Servicing Maintenance and Periodic Checks Buccaneer GT, Falcon GTE Installation, Assembly & Servicing Buccaneer GT, Falcon GTE Installation, Assembly & Servicing Ideal Installer/Technical Helpline 01482 498