IDEAL INDUSTRIES BUC5034 manual Securing the module, Connections Installation with MB1 Module

Page 18

ASSEMBLY

￿

￿￿￿￿￿￿￿

-Introduce the bulb G of the limiter thermostat into the boiler

pocket.

- Connect the charging pump to the boiler control console, ensuring that the terminals live (L), neutral (N) and earth () are properly attached.

-Connect the probe bulb to the boiler control console.

- Introduce the probe bulb into the pocket of the sanitary hot

 

 

 

 

 

￿￿￿￿￿￿￿￿￿￿￿￿

 

 

 

water tank.

 

 

 

 

 

 

 

 

 

 

WARNING

 

 

￿

 

 

 

 

 

If the tank is already fitted with a thermostat, it will not be used :

 

 

 

 

 

 

 

 

 

 

accordingly replace the bulb of this thermostat with the tank probe.

 

 

 

 

 

 

￿￿￿￿￿￿￿

 

 

IMPORTANT: Under no circumstances may the

 

 

 

 

 

 

 

 

wires of the probe (very low voltage) and wires

 

 

￿

 

 

 

 

 

carrying 230 V supply feed be placed in the same

 

 

 

 

 

 

 

 

 

conduit or cable duct. Make sure that a minimum

 

 

 

 

 

 

 

 

 

interval of 10 cm is maintained between them.

 

 

 

 

 

 

 

 

 

Failure to do so can cause interference and lead

 

 

 

 

 

 

 

 

 

to malfunction of the control system and the

 

 

 

 

 

 

 

 

 

deterioration of the electronic circuits.

 

 

 

 

 

 

 

 

 

Securing the module

 

 

 

 

 

 

 

 

 

 

Mount the module by the front so as to secure it with the help of the

 

 

 

 

 

 

 

 

 

 

two screws located on the front section (use a cruciform (Phillips)

 

 

 

 

 

 

 

 

 

 

screwdriver).

 

 

 

 

 

 

 

 

￿￿

 

 

 

 

 

 

 

 

 

￿￿

 

￿

 

 

￿￿￿￿￿￿￿

 

 

 

 

 

 

￿

￿

 

 

 

 

 

 

 

 

 

 

￿

 

 

 

 

 

 

 

 

 

 

￿

 

 

 

 

 

￿￿￿￿￿￿￿￿￿￿￿￿￿

 

￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿ ￿￿￿￿￿￿￿￿￿￿￿￿￿

 

￿￿￿￿￿￿￿￿￿￿￿￿￿

 

￿

 

 

 

 

 

 

 

 

￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿

 

 

 

Connections (Installation with MB1 Module)

 

 

 

 

 

 

 

 

 

 

 

 

￿￿￿￿￿￿￿￿￿

 

 

 

 

￿￿￿￿￿￿

 

￿￿￿￿￿

￿￿

 

 

￿￿￿￿￿￿

 

 

 

 

 

￿￿￿

 

 

￿￿￿￿￿￿￿￿￿￿

 

 

￿￿￿￿￿￿￿￿￿￿￿￿

 

 

￿￿

 

 

￿￿￿￿

￿￿￿￿￿

￿￿￿￿￿￿￿￿￿￿ ￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿

￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿

￿!

￿￿￿￿

￿￿￿￿￿￿ ￿￿￿

 

 

 

￿￿￿￿ ￿￿￿￿￿￿￿￿￿￿￿

 

 

 

 

 

 

 

 

 

 

 

￿

 

 

 

 

 

 

 

 

 

 

￿￿￿￿￿￿￿￿￿

 

 

 

 

 

 

 

 

 

 

 

 

￿￿￿ ￿￿ ￿ ￿ ￿￿￿￿￿￿

￿￿

 

 

 

 

 

￿￿

 

 

 

 

￿

 

 

 

 

 

￿￿￿

 

 

 

 

 

 

 

 

 

￿"￿#$￿%%￿ ￿"￿#$￿%%￿

￿"￿#$￿%%￿

 

 

 

 

 

￿￿￿￿￿￿￿

-Move bridge TL from terminals 1-2 to terminals 1-3.

-Remove bridge LP from terminals 4-5.

-Connect the power supply, the heating pump and the tank load pump as shown.

-Connect the tank sensor.

WARNING

If the installation includes an MB1 module and no room thermostat (TAM), set three position switch 5 (see page 14) to .

If the installation includes an MB1 module and a room thermostat (TAM), set three position switch 5 (see page 14) to AUTO.

18

Buccaneer GT, Falcon GTE - Installation, Assembly & Servicing

Image 18
Contents Installation, Assembly and Servicing General Technical Specifications of Combination Boilers Main Dimensions Buccaneer GT Combination Boiler Falcon GTE Combination BoilerHreaded Boiler Location Installation Installing the BoilerAssembly VentilationInstallation Hydraulic ConnectionsConnection of the Domestic Hot Water Circuit Example of Installation Example Buccaneer GTAssembly Buccaneer GT Combination Boiler Tools requiredAssembly Package IC1, IC2, IC3Assembling the base and draining tube Installing the pipes Assembling the tank front panel Assembling the boiler onto the tankAssembly Falcon GTE Combination Boiler Boiler GTE 4 GTE 5Installing the tubes Assemble the boiler as instructed in figures 1Assembling the boiler on the hot water tank Assembly Hydraulic Boiler to Tank Connections Kit BH46Assembly Controls DescriptionOperating Principle Fitting and Connecting the MB1 Module Electrical ConnectionsTank Sensor Operating and Installation Package AD127MB1 Domestic Hot Water Sensor Boiler SensorInstallation and Connection Adjusting the timing of the charging pumpAdjusting the limiter thermostat Instructions for useConnections Installation with MB1 Module Securing the moduleConnecting the Burner Heating and Domestic Hot Water Installation with MB1 moduleAssembly Commissioning Starting UpCommissioning Secondary Circuit Servicing Maintenance and Periodic Checks Buccaneer GT, Falcon GTE Installation, Assembly & Servicing Buccaneer GT, Falcon GTE Installation, Assembly & Servicing Ideal Installer/Technical Helpline 01482 498