IDEAL INDUSTRIES BUC5034 manual Connecting the Burner

Page 19

ASSEMBLY

4.6Heating and Domestic Hot Water Installation (with MB1 module)

WARNING

IMPORTANT: If the installation includes an MB1 module and no room thermostat (TAM), set three position switch 5 (see page 14) to .

If the installation includes an MB1 module and a room thermostat (TAM), set three position switch 5 (see page 14) to AUTO.

L

8

ZG

F 6,3AT

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

(RG)*

 

 

 

(RG)*

 

(TAM)*

 

BA

 

 

 

 

 

 

 

 

 

11

 

 

 

 

23

18

 

 

25

 

 

 

 

21

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Remove

 

 

 

 

 

 

 

 

 

 

 

22

 

10

9

bridge LP

 

4 BA

 

 

 

 

13 BA

 

 

 

 

 

to benefit

LP

 

 

 

 

 

 

TF*

 

 

 

(TL)*

 

 

from the

 

5 BA

 

 

 

 

12 BA

 

 

1

 

 

 

TEST

 

 

 

 

 

 

 

 

 

 

STB

heating

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

pump

 

 

24

19

20

16

26

 

 

q

 

 

 

 

ZT

logic

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

ZEH 1

 

 

 

 

 

 

 

 

 

 

 

3

2

 

 

 

 

 

 

 

BA 20

BA 24

23 BA

BA 17

q

TS

 

 

 

 

q

 

TCH

 

 

 

 

A

 

 

 

P*

 

 

 

 

 

(B)

 

(CH)*

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

BA 19

BA 22

 

BA 16

 

L1

T1

T2

 

B4

S3

 

14 BA

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

h

 

 

ZG

 

ZEH 2

 

 

 

 

 

 

N

 

 

 

 

 

N

7

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

BA

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

A

 

Heating pump

 

RG

Control unit

 

 

ZEH2

Heating pump Summer/

 

 

B

 

Burner

 

TAM

Room thermostat

 

 

 

 

Winter switch

 

 

BA

 

Connection strip

 

TCH

Boiler thermostat

 

 

ZG

 

Main switch

 

 

CH

 

Time counter

 

TF

Flue gas thermostat

 

ZT

 

Test switch

 

 

CS

 

Safety contact

 

TL

Limiting thermostat

 

 

*

 

Optional

 

 

 

F6, 3AT

Fuse

 

TS

Safety thermostat

 

 

 

 

Connecting strip

 

 

L

 

Phase

 

VA

Alarm indicator

 

 

 

 

Connector

 

 

LP

 

Pump logic

 

V3V

Three-way valve

 

 

 

 

 

 

 

 

 

N

 

Neutral

 

ZEH1

Burner Summer/

 

 

 

 

 

 

 

 

 

P

 

Filling pump

 

 

Winter switch

 

 

 

 

 

 

BUC5031

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

4.7 Connecting the Burner

The boiler is fitted with a cable with a 7-pin European connecting plug which can be plugged into the socket supplied with the burners (see the instructions supplied with the burner).

Buccaneer GT, Falcon GTE - Installation, Assembly & Servicing

19

Image 19
Contents Installation, Assembly and Servicing General Technical Specifications of Combination Boilers Falcon GTE Combination Boiler Main Dimensions Buccaneer GT Combination BoilerHreaded Ventilation Installation Installing the BoilerAssembly Boiler LocationHydraulic Connections InstallationConnection of the Domestic Hot Water Circuit Example Buccaneer GT Example of InstallationTools required Assembly Buccaneer GT Combination BoilerPackage IC1, IC2, IC3 AssemblyAssembling the base and draining tube Assembling the boiler onto the tank Installing the pipes Assembling the tank front panelBoiler GTE 4 GTE 5 Assembly Falcon GTE Combination BoilerAssemble the boiler as instructed in figures 1 Installing the tubesAssembling the boiler on the hot water tank Hydraulic Boiler to Tank Connections Kit BH46 AssemblyDescription Assembly ControlsOperating Principle Electrical Connections Fitting and Connecting the MB1 ModuleBoiler Sensor Operating and Installation Package AD127MB1 Domestic Hot Water Sensor Tank SensorInstructions for use Adjusting the timing of the charging pumpAdjusting the limiter thermostat Installation and ConnectionSecuring the module Connections Installation with MB1 ModuleHeating and Domestic Hot Water Installation with MB1 module Connecting the BurnerStarting Up Assembly CommissioningCommissioning Secondary Circuit Servicing Maintenance and Periodic Checks Buccaneer GT, Falcon GTE Installation, Assembly & Servicing Buccaneer GT, Falcon GTE Installation, Assembly & Servicing Ideal Installer/Technical Helpline 01482 498