IDEAL INDUSTRIES BUC5034 manual Electrical Connections, Fitting and Connecting the MB1 Module

Page 15

ASSEMBLY

4.3 Electrical Connections

The connecting cables may be brought inside the boiler through

The electrical wiring has been carefully checked in the factory and

the cut-outs provided in the cover of the boiler, which may be used

along with purchased cable channels.

the internal connections of the control panel must not be modified

Fasten the cables to the rear plate of the control panel by means of

in any event.

The electrical connections of the boiler shall be made in compliance

the cable clamps (supplied in the instructions bag), after mounting

them on the plate.

with applicable standards and regulations in force.

The pump cable has a connector fitted. Discard the connector.

The unit shall be powered by a circuit with an omnipole switch with

 

an opening distance greater than 3 mm.

WARNING

 

WARNING

VERY IMPORTANT: never place sensor cables

Electrical connections shall be carried out by a

(extra low voltage) and 230 V power supply cables

in the same cable channel or duct.

qualified professional only.

 

 

All the connections shall be made to the connection strip provided

 

for that purpose outside the volume of the control panel.

Refer to Boiler Assembly Instructions for Control Panel Installation

￿￿￿￿￿￿￿￿￿￿￿

￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿

￿￿￿￿￿￿￿￿￿￿￿￿

 

￿￿￿￿￿￿￿

4.4 Installation with MB1 Domestic Hot water Priority and Regulation Mode

Fitting and Connecting the MB1 Module

Fit the MB1 module on the front of the control panel. Proceed as follows:

1. Remove the cover: cut the four fixing studs of the cover with a knife and fold it outward.

2. Install and connect the MB1 module as directed on pages 16-18.

BUC5042

Buccaneer GT, Falcon GTE - Installation, Assembly & Servicing

15

Image 15
Contents Installation, Assembly and Servicing General Technical Specifications of Combination Boilers Main Dimensions Buccaneer GT Combination Boiler Falcon GTE Combination BoilerHreaded Ventilation Installation Installing the BoilerAssembly Boiler LocationInstallation Hydraulic ConnectionsConnection of the Domestic Hot Water Circuit Example Buccaneer GT Example of InstallationTools required Assembly Buccaneer GT Combination BoilerAssembly Package IC1, IC2, IC3Assembling the base and draining tube Assembling the boiler onto the tank Installing the pipes Assembling the tank front panelBoiler GTE 4 GTE 5 Assembly Falcon GTE Combination BoilerInstalling the tubes Assemble the boiler as instructed in figures 1Assembling the boiler on the hot water tank Hydraulic Boiler to Tank Connections Kit BH46 AssemblyAssembly Controls DescriptionOperating Principle Electrical Connections Fitting and Connecting the MB1 ModuleBoiler Sensor Operating and Installation Package AD127MB1 Domestic Hot Water Sensor Tank SensorInstructions for use Adjusting the timing of the charging pumpAdjusting the limiter thermostat Installation and ConnectionSecuring the module Connections Installation with MB1 ModuleHeating and Domestic Hot Water Installation with MB1 module Connecting the BurnerAssembly Commissioning Starting UpCommissioning Secondary Circuit Servicing Maintenance and Periodic Checks Buccaneer GT, Falcon GTE Installation, Assembly & Servicing Buccaneer GT, Falcon GTE Installation, Assembly & Servicing Ideal Installer/Technical Helpline 01482 498