IDEAL INDUSTRIES BUC5034 manual Installation Installing the Boiler, Boiler Location, Ventilation

Page 5

INSTALLATION

2.INSTALLING THE BOILER

2.1 Boiler Location

Sufficient space shall be left clear around the boiler.

The figure stated in metres in the drawings below are the minimum recommended dimensions for providing easy access around the boiler.

Buccaneer GT

 

 

1357

 

 

0.

 

 

5

 

 

m

 

 

 

m

 

 

.5

 

1030

0

 

 

 

 

600

 

 

m

 

 

.5

 

 

0

 

 

1

 

 

m

 

 

BUC5001

2.2

Ventilation

 

The location of air inlets in relation to the high ventilation openings shall ensure that the air is renewed in the entire volume of the boiler room. The ventilation shall comply with any applicable national or local regulations.

2.3 Assembly

The upper section of the MLS 150 tank (only) is provided with marks allowing precise positioning of IDEAL boilers from the Buccaneer GT or Falcon GTE range (see leaflet provided with these units).

Falcon GTE

GTE

L1

H

 

4/150 I

1180

1537

 

5/150 I

 

 

 

 

4/250 I

1424

1587

 

5/250 I

 

 

 

BUC5038

WARNING

Please note that boilers installed in or close to rooms in which the atmosphere is polluted with chlorine or fluorine compounds may be subject to high corrosion.

For example: hairdressing salons, industrial premises (solvents), cooling equipment etc.

Boilers installed in such locations shall not be covered by the warranty.

2.4 Levelling

Levelling of the unit is carried out using the 4 bolts H 10 x 20 (packed in the instruction bag) screwed into the base.

17

 

 

BUC5002

Buccaneer GT, Falcon GTE - Installation, Assembly & Servicing

5

Image 5
Contents Installation, Assembly and Servicing General Technical Specifications of Combination Boilers Hreaded Main Dimensions Buccaneer GT Combination BoilerFalcon GTE Combination Boiler Assembly Installation Installing the BoilerBoiler Location VentilationConnection of the Domestic Hot Water Circuit InstallationHydraulic Connections Example Buccaneer GT Example of InstallationTools required Assembly Buccaneer GT Combination BoilerAssembling the base and draining tube AssemblyPackage IC1, IC2, IC3 Assembling the boiler onto the tank Installing the pipes Assembling the tank front panelBoiler GTE 4 GTE 5 Assembly Falcon GTE Combination BoilerAssembling the boiler on the hot water tank Installing the tubesAssemble the boiler as instructed in figures 1 Hydraulic Boiler to Tank Connections Kit BH46 AssemblyOperating Principle Assembly ControlsDescription Electrical Connections Fitting and Connecting the MB1 ModuleMB1 Domestic Hot Water Sensor Operating and Installation Package AD127Tank Sensor Boiler SensorAdjusting the limiter thermostat Adjusting the timing of the charging pumpInstallation and Connection Instructions for useSecuring the module Connections Installation with MB1 ModuleHeating and Domestic Hot Water Installation with MB1 module Connecting the BurnerCommissioning Secondary Circuit Assembly CommissioningStarting Up Servicing Maintenance and Periodic Checks Buccaneer GT, Falcon GTE Installation, Assembly & Servicing Buccaneer GT, Falcon GTE Installation, Assembly & Servicing Ideal Installer/Technical Helpline 01482 498