IDEAL INDUSTRIES Comprehensive Assembly Guide for the Ideal Falcon GTE

Page 13

 

 

 

 

ASSEMBLY

 

 

3.3 Hydraulic Boiler to Tank Connections Kit (BH46)

 

￿

Assembly

￿￿￿￿

 

￿

￿￿￿

 

￿￿

￿￿￿￿￿￿￿￿￿

 

￿￿￿

￿￿

 

￿

￿

￿￿￿￿￿￿￿￿￿￿￿￿

￿￿￿￿￿￿￿￿

 

 

 

 

 

 

￿

 

￿

 

￿￿￿￿￿￿￿￿￿

￿￿￿

 

￿￿￿￿￿￿

￿

 

 

 

￿￿￿￿￿

￿

￿￿￿

%￿!"

￿

￿

 

 

￿￿￿

 

￿￿￿￿￿￿￿

'￿"￿￿￿"￿￿#￿￿$&￿"￿"'￿￿￿(￿￿"￿￿￿")￿**￿￿￿+￿

 

 

 

 

Connection kit BH46, provides connections from the tank to the boiler.

The kit consists of

-A pump with cable 3

-Insulated flexible connector 13, length 1120mm

-Insulated flexible connector with elbow 12, length 1200mm

-A bag containing:

-An antisyphon valve 10

-Connecting union 4

-Tee with union nut 1

-Tee 7

-Tee with tappings 9

-3 X 1/2" plugs 11

-3 X 1 1/2" O rings 5

-5 X 3/4" O rings 14

-4 X plastic plugs 15

-Flexible clip 16 with fixing 17

IMPORTANT

-Ensure access to pump speed control and vent screw V

-Ensure flexible connectors are run to prevent air pockets

-The 1/2" plug 11 fitted to Tee 1 can be replaced by a drain cock

-To ensure best venting of the assembly and continued good operation of the installation, an automatic vent (P) not supplied, should be fitted on Tee 9 (1/2")

-Screw the Tee with union nut 1 and plug 2 on tank outlet D

-Fit the pump 3 to union nut 4 and Tee 1 inserting O rings 5

-Screw Tee 7 to boiler return B

-Screw Tee with tappings 9 with plug 11 to boiler flow A

-Screw valve Tee 10 with plug 11 to tank inlet C

-Connect elbow flexible 12 (1200mm) between 7 & 4 and flexible 13 (1120mm) between 9 & 10 inserting O rings 14.

-Assemble flexible clip 16 and fitting 17 then clip them in the 7.5mm hole E on the boiler rear panel.

-Fit flexible 13 in clip 16.

The pump cable allows simple connection to the boiler control box. See Electrical section for further information.

Buccaneer GT, Falcon GTE - Installation, Assembly & Servicing

13

Image 13
Contents Installation, Assembly and Servicing General Technical Specifications of Combination Boilers Falcon GTE Combination Boiler Main Dimensions Buccaneer GT Combination BoilerHreaded Assembly Installation Installing the BoilerBoiler Location VentilationHydraulic Connections InstallationConnection of the Domestic Hot Water Circuit Example Buccaneer GT Example of InstallationTools required Assembly Buccaneer GT Combination BoilerPackage IC1, IC2, IC3 AssemblyAssembling the base and draining tube Assembling the boiler onto the tank Installing the pipes Assembling the tank front panelBoiler GTE 4 GTE 5 Assembly Falcon GTE Combination BoilerAssemble the boiler as instructed in figures 1 Installing the tubesAssembling the boiler on the hot water tank Hydraulic Boiler to Tank Connections Kit BH46 AssemblyDescription Assembly ControlsOperating Principle Electrical Connections Fitting and Connecting the MB1 ModuleMB1 Domestic Hot Water Sensor Operating and Installation Package AD127Tank Sensor Boiler SensorAdjusting the limiter thermostat Adjusting the timing of the charging pumpInstallation and Connection Instructions for useSecuring the module Connections Installation with MB1 ModuleHeating and Domestic Hot Water Installation with MB1 module Connecting the BurnerStarting Up Assembly CommissioningCommissioning Secondary Circuit Servicing Maintenance and Periodic Checks Buccaneer GT, Falcon GTE Installation, Assembly & Servicing Buccaneer GT, Falcon GTE Installation, Assembly & Servicing Ideal Installer/Technical Helpline 01482 498