IDEAL INDUSTRIES BUC5034 manual Buccaneer GT, Falcon GTE Installation, Assembly & Servicing

Page 22

NOTES

22

Buccaneer GT, Falcon GTE - Installation, Assembly & Servicing

Image 22
Contents Installation, Assembly and Servicing General Technical Specifications of Combination Boilers Falcon GTE Combination Boiler Main Dimensions Buccaneer GT Combination BoilerHreaded Boiler Location Installation Installing the BoilerAssembly VentilationHydraulic Connections InstallationConnection of the Domestic Hot Water Circuit Example of Installation Example Buccaneer GTAssembly Buccaneer GT Combination Boiler Tools requiredPackage IC1, IC2, IC3 AssemblyAssembling the base and draining tube Installing the pipes Assembling the tank front panel Assembling the boiler onto the tankAssembly Falcon GTE Combination Boiler Boiler GTE 4 GTE 5Assemble the boiler as instructed in figures 1 Installing the tubesAssembling the boiler on the hot water tank Assembly Hydraulic Boiler to Tank Connections Kit BH46Description Assembly ControlsOperating Principle Fitting and Connecting the MB1 Module Electrical ConnectionsTank Sensor Operating and Installation Package AD127MB1 Domestic Hot Water Sensor Boiler SensorInstallation and Connection Adjusting the timing of the charging pumpAdjusting the limiter thermostat Instructions for useConnections Installation with MB1 Module Securing the moduleConnecting the Burner Heating and Domestic Hot Water Installation with MB1 moduleStarting Up Assembly CommissioningCommissioning Secondary Circuit Servicing Maintenance and Periodic Checks Buccaneer GT, Falcon GTE Installation, Assembly & Servicing Buccaneer GT, Falcon GTE Installation, Assembly & Servicing Ideal Installer/Technical Helpline 01482 498