Protect PV.500-MH Operating Instructions
The insulation resistance detected and the two signals are sent to the equipment control. The insulation resistance is displayed as a measured value. Signalling faults are generated from the two isometer signals ( Chapter 6).
Sequence control behaviour differs depending on which solar cells are connected. The solar cells do not need to be earthed for op- eration with monocrystalline or polycrystalline solar cells. In this case, insulation measurement is always active.
For operation with
Insulation measurement sequence control features a "Mainte- nance mode". This mode can only be activated for
34 of 68 | 80000043212 BAL |